Randalls Bury Bank Meaford Stone Staffordshire ST15 0QA Data via plota.co.uk

25/41465/LDCPP - Lawful Development Cert Proposed Public Refused

Proposal

Proposed side extensions, two storey rear extension, loft conversion, car port and two sheds. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Nov 2025
✗
Refused
19 Jan 2026
Appeal
Not lodged

Refused on 19 Jan 2026 · Delegated Decision · Last checked 10 Oct 2026

Site constraints 7

Green belt: Stoke-on-Trent
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 576 m away: Meaford Energy Centre
The site is 576 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Scheduled monument 138 m away: Multivallate hillfort at Bury Bank
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Radon affected area, class 3; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £530,000 in January 2025. Detached house, freehold.

16 January 2025£530,000
10 March 2004£249,950New build

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area140 m² (1,507 sq ft)
Energy ratingD (57 out of 100), could reach C
PropertyDetached house, 6 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Stafford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Stafford
Application type
Lawful Development Cert Proposed Public
Postcode
ST15 0QA
Received
24 Nov 2025
Validated
24 Nov 2025
Ward
Swynnerton And Oulton
Parish
Stone Rural
Case officer
Show
Decision
Refusal
Decision date
19 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Inc Architects

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Refused, as 32% of lawful development certificates here are.

58%decided within 8 weeks
68%approved
103decided in the last year

Plota live figures for lawful development certificates decided by Stafford in the last twelve months, from validation. Stafford decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Stafford
Planning Authority Score
1.8/10
Poor
#278 of 296 overall
Relevant to this application:
Householder decisions

Stafford is one of the slowest councils in England for householder decisions: #290 of 296 on speed. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Stafford decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #227 of 296
90%
Householder approved
Above avg (90%) #195 of 296
26%
Decided in 8 weeks
Below avg (63%) #290 of 296
54%
Extended time limit
Above avg (41%) #245 of 296
72%
Minor dwellings approved
69 decided (1-9 homes)
75%
Major dwellings approved
8 decided (10+ homes)
81%
Change of use approved
26 decided
512
Total decisions
84 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.