50 St Katharines Way, London, E1W 1LA Data via plota.co.uk

PA/26/01431/NC - Tree Works in Conservation Area (S211) Approved

Proposal

Tree works: (T4) Holm oak- Raise canopy to 2.5m above ground level Liquidamber (T8) - London Plane - Reduce crown by 1.5m to a completed height of 10m and crown spread of 6m. . (T11) London Plane - Prune canopy by 1.5m away from marquee canopy (T12) London Plane - Prune canopy to give 2m clearance from bridge (T16) - Re-pollard to previous pruning points to leave a completed height of 13m. To maintain tree within space. Aspen (T17),(T18), (T19) ,(T20) & (T21) - Re-pollard to previous pruning points to leave a completed height of 13m. Pollard points have lapsed and some are beginning to fail. Aspen Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Consultation
27 Aug 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Delegated · Last checked 23 Sept 2026

Site constraints 15

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
The Tower conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 825 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 2.10
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Thames Path 15 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
9 listed buildings within 150 m
Nearest: Group of 12 Bollards at Entrance Lock to St Katherine's Docks, Grade II, 6 m away · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Scheduled monument 193 m away: Tower of London; Flood defence 9 m away (wall, designed for a 1 in 1000 year flood); World heritage site 193 m away: Tower of London; Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Priority habitat 45 m away: Mudflats.
Not affected
Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area430 m² (4,628 sq ft)
Energy ratingD (asset rating 81)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in March 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works in Conservation Area (S211)
Postcode
E1W 1LA
Received
13 Aug 2026
Validated
13 Aug 2026
Ward
St Katharines and Wapping
Case officer
Show
Target decision
24 Sept 2026
Decision
Permit
Decision date
21 Sept 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 39 days from validation, about the council's usual 41 days. Approved, as 99% of tree and landscaping works here are.

97%decided within 8 weeks
99%approved
102decided in the last year

Plota live figures for tree and landscaping works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
18 Sept 2026
Site or press notice
27 Aug 2026
Statutory expiry
24 Sept 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.