Proposed Residential Development Land North Of Soulton Road Wem Shropshire Data via plota.co.uk

25/04502/OUT - Outline Application Awaiting decision

Proposal

Residential Development (Outline) including Access Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 22 Dec 2025
✓
Consultation
29 Dec 2025
Decision
Target date was 28 Aug 2026
Appeal
Appeal decided

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 30 Jul 2026; it is now day 336.

The consultation period closed on 30 Jul 2026.

Documents 27

All documents on the council site ↗

Site constraints 4

Also on the record
Radon affected area, class 2; National infrastructure project about 1.7 km away: Reinforcement to North Shropshire Electricity Distribution Network; 1 listed building within 150 m of the postcode pin; Inside the Wem built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shropshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shropshire
Application type
Outline Application
Received
around 22 Dec 2025
Validated
22 Dec 2025
Ward
Wem
Parish
Wem Town Council
Case officer
Show
Target decision
28 Aug 2026
Applicant
Show

Decision outlook

Day 336, past the statutory target. 96% of outline applications in Shropshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 336280 days past the 56-day target
64%decided within 8 weeks
50%approved
110decided in the last year

Plota live figures for outline applications decided by Shropshire in the last twelve months, from validation. Shropshire decision record →

Public comments

13comments received
9 objecting1 neutral3 supporting

69% object · below the UK average of 74%

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14514040
Planning Portal ref
PP-14514040
Comments by
30 Jul 2026
Site or press notice
29 Dec 2025
Statutory expiry
23 Mar 2026
Env. assessment
No
Shropshire
Planning Authority Score
7.3/10
Good
#53 of 296 overall
Relevant to this application:
Major dwellings

Shropshire is faster than most councils at deciding householder applications: #53 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shropshire decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #179 of 296
93%
Householder approved
Above avg (90%) #136 of 296
78%
Decided in 8 weeks
Above avg (63%) #53 of 296
29%
Extended time limit
Below avg (41%) #50 of 296
68%
Minor dwellings approved
350 decided (1-9 homes)
63%
Major dwellings approved
35 decided (10+ homes)
78%
Change of use approved
27 decided
2,083
Total decisions
273 refused in the year to March 2026