Bridge And Watering Place For Cattle Knockin Shropshire Data via plota.co.uk

26/03460/FUL - Full Planning Application Pending Consideration

Proposal

Works to a listed bridge to facilitate the installation of a surface water drainage pipe, including reinstatement works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Sept 2026
✓
Consultation
14 Oct 2026
Decision
Target date was 11 Nov 2026
Appeal
Appeal decided

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 12 Nov 2026; it is now day 68.

The consultation period closed on 12 Nov 2026.

Site constraints 6

Public footpath about 8 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Knockin conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument about 61 m away: Knockin Castle: a motte and bailey castle immediately east of St Mary's Church
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
4 listed buildings within 150 m of the postcode pin
Nearest: Old House, Grade II, about 40 m from the postcode pin · 1 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Also on the record
National infrastructure project about 965 m away: Green Gen Vyrnwy Frankton, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shropshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shropshire
Application type
Full Planning Application
Received
around 16 Sept 2026
Validated
16 Sept 2026
Ward
Llanymynech
Parish
Knockin
Case officer
Show
Target decision
11 Nov 2026
Applicant
Show
Agent
Environment and Planning Team Dalcour Maclaren

Decision outlook

Day 68, past the statutory target. 82% of listed building works in Shropshire are decided within thirteen weeks, which runs to 16 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 6812 days past the 56-day target
58%decided within 8 weeks
97%approved
257decided in the last year

Plota live figures for listed building works decided by Shropshire in the last twelve months, from validation. Shropshire decision record →

Public comments

1comment received
1 supporting

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15219266
Planning Portal ref
PP-15219266
Comments by
12 Nov 2026
Site or press notice
14 Oct 2026
Statutory expiry
11 Nov 2026
Env. assessment
No
Shropshire
Planning Authority Score
7.3/10
Good
#53 of 296 overall
Relevant to this application:
Householder decisions

Shropshire is faster than most councils at deciding householder applications: #53 of 296 on speed. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shropshire decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #179 of 296
93%
Householder approved
Above avg (90%) #136 of 296
78%
Decided in 8 weeks
Above avg (63%) #53 of 296
29%
Extended time limit
Below avg (41%) #50 of 296
68%
Minor dwellings approved
350 decided (1-9 homes)
63%
Major dwellings approved
35 decided (10+ homes)
78%
Change of use approved
27 decided
2,083
Total decisions
273 refused in the year to March 2026