14 Cathedral Close Exeter EX1 1EZ Data via plota.co.uk

26/1702/LBC - Listed Building Consent Pending Consideration

Proposal

Installation of a non-illuminated building identification sign displaying "AKKERON HOUSE" on the external elevation facing the car park, together with the installation of a non-illuminated entrance plaque displaying "AKKERON HOUSE Head Office of the AKKERON GROUP" adjacent to the principal entrance. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2026
Decision
Expected by 6 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 5 Jan 2027 and 20 Jan 2027, from Exeter's recent listed building works.

Site constraints 6

Grade II listed: 14, Cathedral Close
List entry 1246838 · 5 m away · 29 more listed buildings within 150 m (6 Grade I, 9 Grade II*, 14 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 29 with distances
Historic England ↗
Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 18 m away: Roman, Anglo Saxon and medieval defences called collectively Exeter City Walls
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Heritage at risk 18 m away: Exeter city walls; Radon affected area, class 3; Inside the Exeter built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exeter - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exeter
Application type
Listed Building Consent
Postcode
EX1 1EZ
Received
10 Nov 2026
Validated
10 Nov 2026
Ward
St Davids
Case officer
Show
Target decision
6 Jan 2027
Applicant
Show
Agent
Akkeron Group

Decision outlook

Day 13 of the 56-day target. Exeter usually decides listed building works by day 59.

Day 1346 days to the predicted decision (day 59)
43%decided within 8 weeks
86%approved
122decided in the last year

Plota live figures for listed building works decided by Exeter in the last twelve months, from validation. Exeter decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15358485
Planning Portal ref
PP-15358485
Statutory expiry
6 Jan 2027
Env. assessment
No
Exeter
Planning Authority Score
3.2/10
Poor
#228 of 296 overall
Relevant to this application:
Other decisions

Exeter is slower than most councils at deciding householder applications: #214 of 296 on speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Exeter decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #205 of 296
86%
Householder approved
Below avg (90%) #242 of 296
54%
Decided in 8 weeks
Below avg (63%) #214 of 296
40%
Extended time limit
Below avg (41%) #150 of 296
58%
Minor dwellings approved
31 decided (1-9 homes)
60%
Major dwellings approved
5 decided (10+ homes)
90%
Change of use approved
40 decided
582
Total decisions
86 refused in the year to March 2026