Lower Callerton - Phase 3B, Land To The West Of North Walbottle Road Walbottle Road , Newcastle Upon Tyne Data via plota.co.uk

2018/0382/70/DCC - Approval of Details Reserved by Condition Pending Consideration

Proposal

Submission of details of: Construction Method Statement to comply with condition 4, fencing and other measures (including special construction techniques) to protect trees or other landscape features for condition 5, specification and location of bat and bird boxes and hedgehog hibernacula for condition 6, Remediation Scheme for condition 9, site investigation works in relation to the coal mining legacy of the site for condition 12, badger working method statement for condition 14, Estate Street Phasing and Completion Plan for condition 15, full engineering, drainage, street lighting and constructional details for condition 17, SuDS details for condition 19, existing and proposed site levels for condition 20, highways condition survey for condition 22, foul water scheme for condition 31, archaeological excavation for condition 33, results of the archaeological fieldwork for condition 34, publication of the archaeological fieldwork results for condition 35, details of the retail/commercial unit's opening hours for condition 48 and hours of deliveries for condition 49 of planning permission reference dated 26 June 2019. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 11 Dec 2026.

Documents 19

All documents on the council site ↗

Associated applications 9

Site constraints 2

Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle upon Tyne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Condition
Received
21 Sept 2026
Validated
21 Sept 2026
Ward
Throckley, Walbottle and Newburn
Parish
Not Within A Parish Boundary
Case officer
Show
Target decision
11 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
Lichfields

Consultation & key dates

Statutory expiry
11 Dec 2026
Newcastle upon Tyne
Planning Authority Score
4.9/10
Below average
#154 of 296 overall
Relevant to this application:
Major dwellings

Newcastle upon Tyne is slower than most councils at deciding householder applications: #205 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle upon Tyne decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #113 of 296
95%
Householder approved
Above avg (90%) #86 of 296
56%
Decided in 8 weeks
Below avg (63%) #205 of 296
42%
Extended time limit
Above avg (41%) #165 of 296
84%
Minor dwellings approved
37 decided (1-9 homes)
95%
Major dwellings approved
22 decided (10+ homes)
71%
Change of use approved
70 decided
1,005
Total decisions
103 refused in the year to March 2026