Welsh Harp Environmental Education Centre & open space, Birchen Grove, London, NW9 8RY Data via plota.co.uk

26/2156 - Deemed (Reg3 Councils own Development) Registered

Proposal

Demolition of all buildings and construction of a one-storey environmental education and community centre, including improvements to access arrangements, provision of car and cycle parking, landscaping, play space, boundary treatments and ancillary works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
Decision
Expected by 20 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Oct 2026, from Brent's recent demolitions.

Comments are open until 8 Oct 2026

Comment on this application ↗

Documents 63

Statements & assessments 25

PDF Arboricultural impact assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Air quality impact assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Arboricultural impact assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Design and access statement part 3 Design Access · 25 Aug 2026 View ↗ PDF Design and access statement part 1 Design Access · 25 Aug 2026 View ↗ PDF Design and access statement part 2 Design Access · 25 Aug 2026 View ↗ PDF Drainage strategy, assessment of flood risk & sustainable drainage system statem Supporting Documents · 25 Aug 2026 View ↗ PDF Appendices to drainage strategy Supporting Documents · 25 Aug 2026 View ↗ PDF Preliminary ecological appraisal and roost assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Ecological impact assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Biodiversity statement & metric assessment Supporting Documents · 25 Aug 2026 View ↗ PDF Ecological management & monitoring plan (emmp) Supporting Documents · 25 Aug 2026 View ↗ PDF Construction ecological management plan Supporting Documents · 25 Aug 2026 View ↗ PDF Great crested newt edna survey Supporting Documents · 25 Aug 2026 View ↗ PDF Heritage statement Supporting Documents · 25 Aug 2026 View ↗ PDF Mechanical ventilation and extraction statement Supporting Documents · 25 Aug 2026 View ↗ PDF Noise impact assessment (technical memo) Supporting Documents · 25 Aug 2026 View ↗ PDF Sustainability checklist Supporting Documents · 25 Aug 2026 View ↗ PDF Transport statement part 2 Supporting Documents · 25 Aug 2026 View ↗ PDF Transport statement part 1 Supporting Documents · 25 Aug 2026 View ↗ PDF Bng metric Supporting Documents · 25 Aug 2026 View ↗ PDF Sustainability statement report Supporting Documents · 25 Aug 2026 View ↗ PDF Planning statement appendix 1 Supporting Documents · 25 Aug 2026 View ↗ PDF Planning statement appendix 3 Supporting Documents · 25 Aug 2026 View ↗ PDF Planning statement Supporting Documents · 25 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 9

Local nature reserve: Brent Reservoir / Welsh Harp
Internationally or nationally protected for its wildlife. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Article 4 direction
Article 4 for HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Air quality management area: Brent AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
SSSI 305 m away: Brent Reservoir SSSI; Conservation area 62 m away: St Andrews; Inside the Brent built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Deemed (Reg3 Councils own Development)
Postcode
NW9 8RY
Received
25 Aug 2026
Validated
25 Aug 2026
Ward
Welsh Harp
Case officer
Show
Target decision
20 Oct 2026
Decision level
Planning Committee
Agent
Jones Lang LaSalle Ltd

Decision outlook

Day 45 of the 56-day target. Brent usually decides demolitions by day 56.

Day 4511 days to the 56-day target
73%decided within 8 weeks
75%approved
286decided in the last year

Plota live figures for demolitions decided by Brent in the last twelve months, from validation. Brent decision record →

Public comments

1comment received
1 supporting

24 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15066285
Planning Portal ref
PP-15066285
Comments by
8 Oct 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026