Land To West Of Richmond Way Kingston Upon Hull Data via plota.co.uk

26/00055/CONDET - Discharge of condtions Decided

Proposal

Discharge of conditions 8,9,20,29,36,37 of approval ref. - Full planning permission: - Residential development of Zone A for 214 homes; - Engineering works in respect of the aquagreen serving Riverside; - Engineering works and provision of public amenity access to the east bank of the River Hull; - Landscaping and place shaping in respect of the aquagreen and country park (in part); - Two points of access from Richmond Way to Development Zone A. Outline planning permission with all matters reserved: - Residential development of Zone B for up to 236 homes; - Landscaping and place shaping surrounding Development Zone B. (Revised description November 2023) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Jan 2026
✓
Conditions Partly Discharged
27 Feb 2026

Conditions Partly Discharged on 27 Feb 2026 · Delegated Decision · Last checked 6 Jul 2026

Documents 23

Decision & officer reports 1

All documents on the council site ↗

Associated applications 5

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b, surveyed
Not best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Leeds). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Priority habitat about 4 m away: Coastal and floodplain grazing marsh; National infrastructure project about 1086 m away: East Coast Hydrogen Humber Pipeline, at pre-application.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Discharge of condtions
Postcode
HU7 3FS
Received
21 Jan 2026
Validated
21 Jan 2026
Ward
Kingswood
Case officer
Show
Decision
Conditions Partly Discharged
Decision date
27 Feb 2026
Decision level
Delegated Decision

Consultation & key dates

Alt. reference
PP-14622545
Planning Portal ref
PP-14622545
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Major dwellings

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026