Frederick Holmes School Inglemire Lane Kingston Upon Hull HU6 8JJ Data via plota.co.uk

Proposal

Demolition of existing modular buildings and garden structures; and erection of a new 2 storey building, with new vehicular and pedestrian access from Inglemire Lane, new and reconfigured parking provision, new and reconfigured hard and soft play and landscaping, substation, sprinkler tank and bin store Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Feb 2026
✓
Validated
25 Feb 2026
✓
Approved
7 Aug 2026

Approved on 7 Aug 2026 · Committee Decision · Last checked 8 Aug 2026

Documents 121

Statements & assessments 34

PDF EMAIL FROM BIODIVERSITY OFFICER Correspondence · 17 Jul 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Report · 17 Jul 2026 View ↗ PDF UPDATED BNG METRIC BackGround Papers · 19 Jun 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Report · 2 Jun 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Report · 12 May 2026 View ↗ PDF FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT Report · 12 May 2026 View ↗ PDF CONSTRUCTION METHOD STATEMENT BackGround Papers · 7 May 2026 View ↗ PDF BIODIVERSITY OFFICER COMMENTS Correspondence · 24 Apr 2026 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT REPORT PART 1 BackGround Papers · 17 Apr 2026 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT REPORT PART 1 BackGround Papers · 17 Apr 2026 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT REPORT PART 3 BackGround Papers · 17 Apr 2026 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT REPORT PART 2 BackGround Papers · 17 Apr 2026 View ↗ PDF GEOENVIRONMENTAL ASSESSMENT REPORT PART 4 BackGround Papers · 17 Apr 2026 View ↗ PDF FLOOD TEAM COMMENTS Correspondence · 24 Mar 2026 View ↗ PDF BASELINE BNG HABITATS Report · 6 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT Report · 5 Mar 2026 View ↗ PDF POST DEVELOPMENT STATUTORU BIODIVERSITY METRIC BackGround Papers · 5 Mar 2026 View ↗ PDF PLANNING STATEMENT BackGround Papers · 5 Mar 2026 View ↗ PDF BIODIVERSITY SURVEY AND REPORT Other · 19 Feb 2026 View ↗ PDF BNG REPORT Report · 19 Feb 2026 View ↗ PDF FLOOD RISK ASSESSMENT Report · 19 Feb 2026 View ↗ PDF LAND CONTAMINATION ASSESSMENT Report · 19 Feb 2026 View ↗ PDF ARBORICULTURAL ANDMETHOD STATEMENT Report · 19 Feb 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Report · 19 Feb 2026 View ↗ PDF ENERGY REPORT Report · 19 Feb 2026 View ↗ PDF VENTILATION OR EXTRACTION STATEMENT Other · 19 Feb 2026 View ↗ PDF FLOOD RISK SEQUENTIAL TEST Report · 19 Feb 2026 View ↗ PDF TRANSPORT ASSESSMENT Report · 19 Feb 2026 View ↗ PDF UTILITY MAPPING SURVEY Drawing · 19 Feb 2026 View ↗ PDF TOPOGRAPHICAL SURVEY Drawing · 19 Feb 2026 View ↗ PDF TOPOGRAPHICAL SURVEY Drawing · 19 Feb 2026 View ↗ PDF TOPOGRAPHICAL SURVEY Drawing · 19 Feb 2026 View ↗ PDF LAND CONTAMINATION ASSESSMENT Report · 19 Feb 2026 View ↗ PDF LAND CONTAMINATION ASSESSMENT Report · 19 Feb 2026 View ↗

Plans & drawings 42

PDF SECTION 106 AGREEMENT BackGround Papers · 4 Aug 2026 View ↗ PDF PROPOSED SITE - BLOCK PLAN Drawing · 10 Jun 2026 View ↗ PDF SITE WIDE SECTIONS EXISTING AND PROPOSED SHEET 1 OF 2 Drawing · 2 Jun 2026 View ↗ PDF LANDSCAPE STRATEGY GA MASTERPLAN Drawing · 2 Jun 2026 View ↗ PDF LANDSCAPE STRATEGY FENCING PLAN Drawing · 2 Jun 2026 View ↗ PDF PROPOSED EXTERNAL LIGHTING LAYOUT Drawing · 2 Jun 2026 View ↗ PDF PROPOSED SITE LEVELS SHEET 2 OF 2 Drawing · 2 Jun 2026 View ↗ PDF SITE WIDE SECTIONS EXISTING AND PROPOSED SHEET 2 OF 2 Drawing · 2 Jun 2026 View ↗ PDF PROPOSED SITE LEVELS SHEET 1 OF 2 Drawing · 2 Jun 2026 View ↗ PDF PROPOSED EXTERNAL SERVICES LAYOUT Drawing · 2 Jun 2026 View ↗ PDF SITE WASTE MANAGEMENT REFUSE STORAGE PLAN Drawing · 2 Jun 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Drawing · 12 May 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 12 May 2026 View ↗ PDF LANDSCAPE STRATEGY GA MASTERPLAN Drawing · 12 May 2026 View ↗ PDF PROPOSED EXTERNAL LIGHTING LAYOUT Drawing · 13 Mar 2026 View ↗ PDF PROPOSED EXTERNAL SERVICES LAYOUT Drawing · 13 Mar 2026 View ↗ PDF TREE RETENTION AND REMOVAL PLAN Drawing · 5 Mar 2026 View ↗ PDF STREET SCENE/CONTEXT PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF PROPOSED WINDOW DETAILS Drawing · 19 Feb 2026 View ↗ PDF THE LOCATION PLAN OS Extract · 19 Feb 2026 View ↗ PDF SITE DEMOLITION PLAN Drawing · 19 Feb 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Other · 19 Feb 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Drawing · 19 Feb 2026 View ↗ PDF ROOF PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF GA PLAN AND ELEVATIONS Drawing · 19 Feb 2026 View ↗ PDF REFUSE STORAGE Drawing · 19 Feb 2026 View ↗ PDF STREET SCENE/CONTEXT PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF BASELINE ONSITE HABITAT MAP/PLAN (PRE-DEVELOPMENT) Other · 19 Feb 2026 View ↗ PDF PROPOSED ELEVATIONS Drawing · 19 Feb 2026 View ↗ PDF PROPOSED 3D VIEWS Drawing · 19 Feb 2026 View ↗ PDF MATERIAL ELEVATIONS Drawing · 19 Feb 2026 View ↗ PDF SITE LEVELS PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF SITE LEVELS PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF FLOOR PLAN - EXISTING Other · 19 Feb 2026 View ↗ PDF TRAVEL PLAN Report · 19 Feb 2026 View ↗ PDF ONSITE HABITAT MAP/PLAN (POST-DEVELOPMENT) Other · 19 Feb 2026 View ↗ PDF SITE/BLOCK PLAN - EXISTING Other · 19 Feb 2026 View ↗ PDF BLOCK PLAN OF THE SITE Drawing · 19 Feb 2026 View ↗ PDF SITE WIDE SECTIONS EXISTING AND PROPOSED SHEET 1 OF 2 Drawing · 19 Feb 2026 View ↗ PDF SITE WIDE SECTIONS EXISTING AND PROPOSED SHEET 1 OF 2 Drawing · 19 Feb 2026 View ↗ PDF LAYOUT PLAN - PROPOSED Other · 19 Feb 2026 View ↗ PDF ADDITIONAL PLANS Drawing · 19 Feb 2026 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 2

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area72 m² (775 sq ft)
Energy ratingG (asset rating 188)
UseD1 Non-residential Institutions - Education
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in March 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Full Planning Permission
Postcode
HU6 8JJ
Received
19 Feb 2026
Validated
25 Feb 2026
Ward
University
Case officer
Show
Decision
Application Permitted
Decision date
7 Aug 2026
Decision level
Committee Decision
Agent
Sewell Construction Ltd c/o Avison Young (UK) Limited
Leaseholder
Show

How this decision compares

Decided in 163 days from validation, 108 days slower than Hull's median of 55 for demolitions. Approved, as 94% of demolitions here are.

61%decided within 8 weeks
94%approved
35decided in the last year

Plota live figures for demolitions decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

91 neighbours consulted · Last counted 8 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14698533
Planning Portal ref
PP-14698533
Comments by
1 Apr 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.