Land on Hayes Road, Sully. Data via plota.co.uk

2024/00534/FUL - Full Planning Application Refused

Proposal

Approximately 2.5 hectares of vehicle and container storage, with approximately 1.2 hectares of rewilding and planting in the southwest of the site and along the boundary. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jun 2024
✓
Validated
3 Nov 2025
✗
Refused
19 Jun 2026
Appeal
Not lodged

Refused on 19 Jun 2026 · Committee · Last checked 20 Nov 2026

Planning committee

Decided by Glamorgan Planning Committee on 18 Jun 2026.

Refused

No officer report was published for this decision; this summary is from the committee minutes.

  • The application sought permission for about 2.5 hectares of vehicle and container storage with rewilding on part of the site.
  • Members raised concerns over employment land use, design, biodiversity, highway safety and neighbour amenity.
  • Planning Committee refused the application for these reasons.
Read how the committee decided The proposal and the committee's reasons for refusal.

Source: Plota analysis of Glamorgan's committee minutes of 18 Jun 2026.

Documents 33

All documents on the council site ↗

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
SSSI about 238 m away: Hayes Point to Bendrick Rock; Radon affected area, class 3.
Not affected
No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Glamorgan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Glamorgan
Application type
Full Planning Application
Received
7 Jun 2024
Validated
3 Nov 2025
Ward
Sully
Parish
Sully Community Council
Case officer
Show
Target decision
29 Dec 2025
Decision
Refused
Decision date
19 Jun 2026
Decision level
Committee
Applicant
Show
Agent
Plan-It Design (Wales) Ltd

How this decision compares

Decided in 228 days from validation, 164 days slower than Glamorgan's median of 64 for full applications. Refused, as 10% of full applications here are.

40%decided within 8 weeks
90%approved
640decided in the last year

Plota live figures for full applications decided by Glamorgan in the last twelve months, from validation. Glamorgan decision record →

Consultation & key dates

Comments by
18 Dec 2025
Committee
18 Jun 2026