Saltash St Michaels Avenue Kingsland Leominster Herefordshire HR6 9QP Data via plota.co.uk

P251597/FH - Full Householder Approved

Proposal

PENDING S106 AGREEMENT - Proposal to replace a septic tank with a package treatment plant Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2025
✓
Approved
24 Jul 2025

Approved on 24 Jul 2025 · Last checked 14 Oct 2026

Site constraints 8

Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Kingsland conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
11 listed buildings within 150 m
Nearest: The Brick House, Grade II, 61 m away · 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Also on the record
Scheduled monument 185 m away: Kingsland Castle; Radon affected area, class 3; Inside the Kingsland built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Householder
Postcode
HR6 9QP
Received
29 May 2025
Validated
29 May 2025
Ward
Bircher
Parish
Kingsland
Target decision
24 Jul 2025
Decision
Approved with Conditions
Decision date
24 Jul 2025

How this decision compares

Decided in 56 days from validation, about the council's usual 57 days. Approved, as 97% of householder applications here are.

50%decided within 8 weeks
97%approved
499decided in the last year

Plota live figures for householder applications decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
6 Jun 2025
Comments by
16 Jul 2025
Site or press notice
6 Jun 2025
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Householder decisions

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026