Homeville , Packhorse Lane, South Stoke, Bath, Bath And North East Somerset, BA2 7DL Data via plota.co.uk

25/04850/FUL - Full Application Pending Consideration

Proposal

Erection of 1no. dwelling following demolition of the existing dwelling and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Dec 2025
✓
Validated
24 Dec 2025
Decision
Target date was 18 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 329.

Site constraints 7

Green belt: Bath and Bristol
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Cotswolds National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Conservation area 23 m away: Southstoke
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
4 listed buildings within 150 m; Inside the Bath built-up area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £1,085,000 in January 2023. Detached house, freehold.

13 January 2023£1,085,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area228 m² (2,454 sq ft)
Energy ratingE (54 out of 100), could reach C
PropertyDetached house, 8 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Full Application
Postcode
BA2 7DL
Received
18 Dec 2025
Validated
24 Dec 2025
Ward
Bathavon South
Parish
South Stoke
Case officer
Show
Target decision
18 Feb 2026
Applicant
Show
Agent
Mitchell Eley Gould

Decision outlook

Day 329, past the statutory target. 54% of new homes in Bath are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 14 Nov 2026.

Day 329273 days past the 56-day target
32%decided within 8 weeks
87%approved
94decided in the last year

Plota live figures for new homes decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-14537012
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 councils
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications, ranking #236 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.