200, Castelnau, Barnes Data via plota.co.uk

PA25/3884 - Full Application Approved

Proposal

Construction of a single storey rear extension and change of use of existing lower ground floor flat from C3 to E(e) to enable the enlargement of the existing dental practice to provide a further 3 x surgeries. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Consultation
12 Dec 2025
✓
Approved
28 Jan 2026

Approved on 28 Jan 2026 · Delegated Decision Team Leader · Last checked 9 Oct 2026

Associated applications 2

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Castelnau conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Richmond AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
1 listed building within 150 m; SSSI 455 m away: Barn Elms Wetland Centre SSSI; Inside the Richmond upon Thames built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land 83 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area176 m² (1,894 sq ft)
Energy ratingD (asset rating 95)
UseD1 Non-residential Institutions - Primary Health Care Building
HeatingAir Conditioning

From the energy performance certificate lodged in April 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Richmond upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
2 Dec 2025
Validated
2 Dec 2025
Ward
Barnes Ward [BRN]
Case officer
Show
Target decision
27 Jan 2026
Decision
Granted Permission
Decision date
28 Jan 2026
Decision level
Delegated Decision Team Leader
Applicant
Show
Agent
MZA Planning

How this decision compares

Decided in 57 days from validation, about the council's usual 55 days. Approved, as 77% of full applications here are.

59%decided within 8 weeks
77%approved
356decided in the last year

Plota live figures for full applications decided by Richmond upon Thames in the last twelve months, from validation. Richmond upon Thames decision record →

Consultation & key dates

Alt. reference
PP-14410253
Comments by
2 Jan 2026
Site or press notice
12 Dec 2025
Statutory expiry
24 Dec 2025
Richmond upon Thames
Planning Authority Score
4.4/10
Below average
#182 of 296 councils
Relevant to this application:
Change of use

Richmond upon Thames ranks #130 out of 296 councils for householder decision speed. Richmond upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Richmond upon Thames decision statistics
Based on MHCLG data, the year to March 2026
81%
Overall approval rate
Below avg (87%) #257 of 296
82%
Householder approved
Below avg (90%) #268 of 296
69%
Decided in 8 weeks
Above avg (63%) #130 of 296
35%
Extended time limit
Below avg (41%) #104 of 296
68%
Minor dwellings approved
181 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
47%
Change of use approved
17 decided
1,888
Total decisions
358 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.