Eastleigh Rail Works, Campbell Road, Eastleigh, SO50 5AD Data via plota.co.uk

DC/25/100223 - Industry, Storage, Warehousing Decided

Proposal

Application for partial discharge of Condition 31 (contaminated land verification - Plots 300 and 303), of planning permission for 'demolition of existing buildings and erection of up to 2,444 sq. m of floorspace (GIA) for use within: Class B1(c); Class B2 and /or Class B8; provision for 'open storage' (Class B8) from up to circa 2.5 hectares (part permanent and part temporary); alterations to access including road widening, new footpath and creation of new vehicular access via Campbell Road; installation of acoustic barrier; and associated works including parking, services, landscaping, infrastructure and groundworks'. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2025
✓
Validated
9 Oct 2025
✓
Partial discharge
15 Jan 2026

Partial discharge on 15 Jan 2026 · Delegated Decision · Last checked 10 Oct 2026

Associated applications 5

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 3; Inside the Eastleigh built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
Industry, Storage, Warehousing
Postcode
SO50 5AD
Received
8 Oct 2025
Validated
9 Oct 2025
Ward
Eastleigh Central Ward;Eastleigh Central Ward
Parish
Eastleigh Town CP;Eastleigh Town CP
Target decision
4 Dec 2025
Decision
Partial discharge
Decision date
15 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Neame Sutton Limited (Amanda Sutton)

Consultation & key dates

Comments by
16 Dec 2025
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 overall
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications: #94 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026