363 Preston Road Kingston Upon Hull HU9 5AN Data via plota.co.uk

Pending Consideration 26/00943/PD
Council
Date received
29 Sept 2026
Date validated
30 Sept 2026
Postcode
HU9 5AN

Description

Internal remodelling and introduction of ramps Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 24 Nov 2026, from Hull's recent extensions.

Day 9 of the 56-day target. Hull usually decides extensions by day 55.

Day 947 days to the 56-day target
66%decided within 8 weeks
88%approved
160decided in the last year

Plota live figures for extensions decided by Hull in the last twelve months, from validation. Hull decision record →

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Kingston upon Hull built-up area; National infrastructure project about 1786 m away: East Coast Hydrogen Humber Pipeline, at pre-application.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area151 m² (1,625 sq ft)
Energy ratingC (69 out of 100), could reach B
PropertyDetached house, 8 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in September 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.