North House Casewick Hall Casewick Park Casewick Lincolnshire PE9 4RX Data via plota.co.uk

S25/2114 - Works to TPO Tree(s) Refused

Proposal

Reduce service tree (T1) to 9 metres from ground level (TPO-107). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2025
✓
Validated
7 Nov 2025
✗
Refused
26 Mar 2026
Appeal
Not lodged

Refused on 26 Mar 2026 · Delegated Decision · Last checked 12 Oct 2026

Site constraints 4

Grade I listed: Casewick Hall
List entry 1165624 · 15 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 1.1 km away: Mallard Pass Solar Project; Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to TPO Tree(s)
Postcode
PE9 4RX
Received
4 Nov 2025
Validated
7 Nov 2025
Ward
Casewick Ward
Parish
Uffington Parish Council
Case officer
Show
Target decision
2 Jan 2026
Decision
TCA - TPO Work Refused
Decision date
26 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
All Seasons Tree Care LTD

How this decision compares

Decided in 139 days from validation, 104 days slower than South Kesteven's median of 35 for tree works. Refused, as 5% of tree works here are.

87%decided within 8 weeks
95%approved
345decided in the last year

Plota live figures for tree works decided by South Kesteven in the last twelve months, from validation. South Kesteven decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14463559
Planning Portal ref
PP-14463559
Comments by
24 Nov 2025
Statutory expiry
2 Jan 2026
Env. assessment
No
South Kesteven
Planning Authority Score
2.7/10
Poor
#244 of 296 overall
Relevant to this application:
Householder decisions

South Kesteven is slower than most councils at deciding householder applications: #262 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
South Kesteven decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #100 of 296
94%
Householder approved
Above avg (90%) #118 of 296
43%
Decided in 8 weeks
Below avg (63%) #262 of 296
60%
Extended time limit
Above avg (41%) #270 of 296
69%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
20 decided (10+ homes)
87%
Change of use approved
55 decided
1,002
Total decisions
95 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use