Land West of Hatchet Mead, Furzey Lane, Beaulieu, Brockenhurst, SO42 7WB Data via plota.co.uk

26/01261OHL - Overhead Lines Site Visit

Proposal

Application under section 37 of the Electricity Act 1989 and section 90(2) of the Town and Country Planning Act 1990 for 2no. replacement electricity poles Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Consultation
2 Nov 2026
✓
Validated
9 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Dec 2026 and 4 Jan 2027, from recent other across the UK.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 11

Aerodrome safeguarding zone
Special area of conservation: The New Forest
3 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: The New Forest SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Forest South East conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Priority habitat: Lowland dry acid grassland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Lowland dry acid grassland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Lines
Postcode
SO42 7WB
Received
2 Nov 2026
Validated
9 Nov 2026
Parish
Beaulieu Parish Council
Case officer
Show
Target decision
28 Dec 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Councils usually decide other by day 53.

Day 1442 days to the 56-day target
65%decided within 8 weeks
95%approved
2,220decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in New Forest (Park) to go on. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
By E-mail
Comments by
7 Dec 2026
Site or press notice
2 Nov 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 overall
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications: #254 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026