Land adj to Carno Wind Farm, Carno Wind Farm , Carno, Powys, SY17 5JS Data via plota.co.uk

P/26/0988/DIS - Approval of details reserved by a condition Valid

Proposal

Discharge of condition 26 of planning approval Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Sept 2026
✓
Validated
30 Sept 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 25 Nov 2026.

Associated applications 7

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Radon affected area, class 4; National infrastructure project about 100 m away: Mid Wales Electricity Connection (N Grid).
Not affected
No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Approval of details reserved by a condition
Postcode
SY17 5JS
Received
9 Sept 2026
Validated
30 Sept 2026
Ward
Caersws;Llanbrynmair
Parish
Caersws;Llanbrynmair;Trefeglwys
Case officer
Show
Target decision
25 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗