Land to the west of Preston Road, Grimsargh, Preston Data via plota.co.uk

Pending 06/2026/0876
Date received
around 21 Aug 2026
Date validated
21 Aug 2026

Description

Discharge of condition no.14 (Surface water drainage) attached to planning permission Data via plota.co.uk

Last checked

Site constraints 4

Also on the record
Radon affected area, class 4; SSSI 379 m away: Red Scar and Tun Brook Woods SSSI; Inside the Grimsargh built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Preston - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Preston
Planning Authority Score
6.2/10
Average
#92 of 296 councils
Relevant to this application:
Householder decisions

Preston ranks #118 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Preston decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #90 of 296
98%
Householder approved
Above avg (90%) #21 of 296
71%
Decided in 8 weeks
Above avg (63%) #118 of 296
46%
Extended time limit
Above avg (41%) #202 of 296
86%
Minor dwellings approved
70 decided (1-9 homes)
81%
Major dwellings approved
26 decided (10+ homes)
94%
Change of use approved
63 decided
653
Total decisions
50 refused in the year to March 2026