Land at Brackley Lane Calvert Charndon Buckinghamshire Data via plota.co.uk

PL/26/07715/FA - County Matter Application Registered

Proposal

Proposal to extend the existing Incinerator Bottom Ash (IBA) site to provide additional IBA storage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 24 Sept 2026
✓
Consultation
6 Oct 2026
Decision
Expected by 24 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Nov 2026 and 21 Dec 2026, from Buckinghamshire's recent commercial and major works.

Comments are open until 4 Nov 2026

Comment on this application ↗

Documents 15

All documents on the council site ↗

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 546 m away: Rosefield Solar Farm
The site is 546 m from the project boundary. Generating station, examination closed, recommendation due. Also within 2 km: East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 141 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Buckinghamshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
County Matter Application
Postcode
HP18 0AF
Received
around 24 Sept 2026
Validated
24 Sept 2026
Ward
Grendon Underwood and The Claydons
Parish
Calvert Green
Case officer
Show
Target decision
24 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Buckinghamshire usually decides commercial and major works by day 73.

Day 1558 days to the predicted decision (day 73)
34%decided within 8 weeks
86%approved
111decided in the last year

Plota live figures for commercial and major works decided by Buckinghamshire in the last twelve months, from validation. Buckinghamshire decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
6 Oct 2026
Consultation
6 Oct 2026
Comments by
4 Nov 2026
Site or press notice
14 Oct 2026
Statutory expiry
24 Dec 2026
Env. assessment
No
Buckinghamshire
Planning Authority Score
1.3/10
Poor
#284 of 296 councils
Relevant to this application:
Householder decisions

Buckinghamshire is one of the slowest councils in England for householder decisions, ranking #280 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Buckinghamshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #217 of 296
86%
Householder approved
Below avg (90%) #241 of 296
34%
Decided in 8 weeks
Below avg (63%) #280 of 296
55%
Extended time limit
Above avg (41%) #248 of 296
76%
Minor dwellings approved
491 decided (1-9 homes)
82%
Major dwellings approved
71 decided (10+ homes)
82%
Change of use approved
131 decided
4,446
Total decisions
690 refused in the year to March 2026