The Willows Sports And Social Club, Forest Road, Hainault, Ilford, IG6 3SL Data via plota.co.uk

2310/26 - Works to TPO Tree(s) Approved

Proposal

TPO - T1 (Weeping Willow) - Reduce overall canopy by 8M (approx 40%). T2 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Approved
1 Oct 2026

Approved on 1 Oct 2026 · Delegated C/Signed G. Cooper · Last checked 2 Oct 2026

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Redbridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,646 m² (17,717 sq ft)
Energy ratingC (asset rating 71)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingAir Conditioning

From the energy performance certificate lodged in August 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Redbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Redbridge
Application type
Works to TPO Tree(s)
Postcode
IG6 3SL
Received
4 Sept 2026
Validated
4 Sept 2026
Ward
Hainault
Case officer
Show
Target decision
29 Oct 2026
Decision
Granted/Approved - with conditions
Decision date
1 Oct 2026
Decision level
Delegated C/Signed G. Cooper
Applicant
Show
Agent
kempster and sons tree services

How this decision compares

Decided in 27 days from validation, 4 days slower than Redbridge's median of 23 for tree and landscaping works. Approved, as 89% of tree and landscaping works here are.

100%decided within 8 weeks
89%approved
345decided in the last year

Plota live figures for tree and landscaping works decided by Redbridge in the last twelve months, from validation. Redbridge decision record →

Consultation & key dates

Alt. reference
PP-15200772
Comments by
24 Sept 2026
Site or press notice
4 Sept 2026
Statutory expiry
2 Oct 2026
Redbridge
Planning Authority Score
4.5/10
Below average
#174 of 296 councils
Relevant to this application:
Householder decisions

Redbridge ranks #129 out of 296 councils for householder decision speed. Redbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Redbridge decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #292 of 296
82%
Householder approved
Below avg (90%) #267 of 296
69%
Decided in 8 weeks
Above avg (63%) #129 of 296
34%
Extended time limit
Below avg (41%) #90 of 296
57%
Minor dwellings approved
152 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
32%
Change of use approved
192 decided
1,673
Total decisions
461 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.