Land North Of Stevens And Carlotti Ramsgate Road Sandwich Kent Data via plota.co.uk

26/00159 - Full Planning Permission Approved

Proposal

Construction of Greener Grid Park comprising of grid balancing equipment along with associated infrastructure, hard/soft landscaping and access Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Feb 2026
✓
Validated
19 Feb 2026
✓
Consultation
6 Mar 2026
✓
Approved
28 May 2026

Approved on 28 May 2026 · Delegated · Last checked 6 Jul 2026

Documents 61

Statements & assessments 40

PDF RESPONSE TO: ECOLOGY COMMENTS Report · 30 Apr 2026 View ↗ PDF MORPH SURVEY Report · 30 Apr 2026 View ↗ PDF RIVER TYPE SURVEY Report · 30 Apr 2026 View ↗ PDF ECOLOGY CONSULTEE COMMENTS Consultee Response · 24 Apr 2026 View ↗ PDF LIGHTING ASSESSMENT REPORT Report · 17 Apr 2026 View ↗ PDF HERITAGE CONSULTEE RESPONSE Consultee Response · 26 Mar 2026 View ↗ PDF HERITAGE IMPACT ASSESSMENT Report · 25 Mar 2026 View ↗ PDF LOCAL FLOOD AUTHORITY Consultee Response · 20 Mar 2026 View ↗ PDF BIODIVERSITY UNIT RESERVATION LETTER Correspondence · 19 Mar 2026 View ↗ PDF CONSULTATION STATEMENT Report · 10 Mar 2026 View ↗ PDF 2512045-0501 REV P04 DRAINAGE STRATEGY Report · 10 Mar 2026 View ↗ PDF EMPLOYMENT LAND STATEMENT Report · 10 Mar 2026 View ↗ PDF EMPLOYMENT LAND STATEMENT - APPENDICES Report · 10 Mar 2026 View ↗ PDF FLOOD RISK ASSESSMENT 1 OF 2 Report · 10 Mar 2026 View ↗ PDF FLOOD RISK ASSESSMENT 2 OF 2 Report · 10 Mar 2026 View ↗ PDF EXTERNAL LED LIGHTING ASSESSMENT REPORT Report · 10 Mar 2026 View ↗ PDF NOISE IMPACT ASSESSMENT REPORT Report · 10 Mar 2026 View ↗ PDF PLANNING, DESIGN AND ACCESS STATEMENT Report · 10 Mar 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT Report · 10 Mar 2026 View ↗ PDF BNG METRIC Report · 10 Mar 2026 View ↗ PDF TRANSPORT STATEMENT AND CONSTRUCTION MANAGEMENT PLAN Report · 10 Mar 2026 View ↗ PDF TREE SURVEY AND IMPACT ASSESSMENT Report · 10 Mar 2026 View ↗ PDF BNG NET GAIN ASSESSMENT Report · 10 Mar 2026 View ↗ PDF ECOLOGY REPORT Report · 10 Mar 2026 View ↗ PDF SUPERSEDED - BNG METRIC TOOL Report · 20 Feb 2026 View ↗ PDF BNG COVER LETTER Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - CONSULTATION STATEMENT - FINAL Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - ECOLOGY REPORT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - EMPLOYMENT LAND STATEMENT GRANT MILLS WOOD Report · 18 Feb 2026 View ↗ PDF FRA AND DRAINAGE STRATEGY Report · 18 Feb 2026 View ↗ PDF FRA AND DRAINAGE STRATEGY PART 2 Report · 18 Feb 2026 View ↗ PDF FRA AND DRAINAGE STRATEGY PART 3 Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - EXTERNAL LED LIGHTING ASSESSMENT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - PLANNING, DESIGN AND ACCESS STATEMENT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - PRELIMINARY RISK ASSESSMENT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - PRELIMINARY RISK ASSESSMENT PART 2 Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - PRELIMINARY RISK ASSESSMENT PART 3 Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - TRANSPORT STATEMENT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - TREE SURVEY IMPACT ASSESSMENT Report · 18 Feb 2026 View ↗ PDF SUPERSEDED - NOISE IMPACT ASSESSMENT REPORT R2 Report · 18 Feb 2026 View ↗

All documents on the council site ↗

Site constraints 9

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project about 33 m away: Richborough Connection Project
The site is about 33 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Thanet Extension Offshore Wind Farm (decided, about 79 m); Sea Link (awaiting the Secretary of State's decision, about 931 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area about 236 m away: Thanet Coast & Sandwich Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI about 236 m away: Sandwich Bay to Hacklinge Marshes SSSI; Flood defence about 17 m from the postcode pin (natural high ground, designed for a 1 in 5 year flood); Coalfield, development low risk area; Inside the Cliffs End built-up area; Priority habitat about 16 m away: Mudflats.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Full Planning Permission
Postcode
CT13 9ST
Received
18 Feb 2026
Validated
19 Feb 2026
Ward
Sandwich
Parish
SANDWICH
Case officer
Show
Target decision
21 May 2026
Decision
Grant Planning Permission
Decision date
28 May 2026
Decision level
Delegated
Agent
DWD Property and Planning Limited

How this decision compares

Decided in 98 days from validation, 72 days slower than Dover's median of 26 for utility and infrastructure works. Approved, as 95% of utility and infrastructure works here are.

85%decided within 8 weeks
95%approved
41decided in the last year

Plota live figures for utility and infrastructure works decided by Dover in the last twelve months, from validation. Dover decision record →

Consultation & key dates

Site or press notice
6 Mar 2026
Statutory expiry
21 May 2026
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 councils
Relevant to this application:
Householder decisions

Dover is one of the fastest councils in England for householder decisions, ranking #28 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026