Wild Duck Inn Ewen Cirencester Gloucestershire GL7 6BY Data via plota.co.uk

26/00219/FUL - Full Application Awaiting decision

Proposal

Installation of new electrical substation, within GRP enclosure Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
22 Jan 2026
Validated
28 Jan 2026
Decision
Expected by 25 Mar 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision soon after comments close on 16 Sept 2026; it is now day 227. Comments are open until 16 Sept 2026.

Comment on this application ↗

Site constraints 5

Grade II listed: The Wild Duck Inn
List entry 1090077 · 2 m from the pin · 3 more listed buildings within 150 m (3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 3 with distances
Historic England ↗
Ewen Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Ewen built-up area; Priority habitat 18 m away: Deciduous woodland; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cotswold - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cotswold
Application type
Full Application
Postcode
GL7 6BY
Received
22 Jan 2026
Validated
28 Jan 2026
Ward
Kemble
Parish
Kemble & Ewen
Case officer
Show
Target decision
25 Mar 2026
Applicant
Show

Decision outlook

Day 227, past the statutory target. 88% of utility and infrastructure works in Cotswold are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 6 Sept 2026.

Day 2275 days to the predicted decision (day 232)
56%decided within 8 weeks
96%approved
33decided in the last year

Plota live figures for utility and infrastructure works decided by Cotswold in the last twelve months, from validation. Cotswold decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
16 Sept 2026
Statutory expiry
25 Mar 2026
Env. assessment
No
Cotswold
Planning Authority Score
3.5/10
Below average
#218 of 296 councils
Relevant to this application:
Householder decisions

Cotswold is slower than most councils at deciding householder applications, ranking #219 out of 296. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cotswold decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #128 of 296
92%
Householder approved
Above avg (90%) #150 of 296
53%
Decided in 8 weeks
Below avg (63%) #219 of 296
48%
Extended time limit
Above avg (41%) #212 of 296
74%
Minor dwellings approved
123 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
84%
Change of use approved
38 decided
1,252
Total decisions
138 refused in the year to March 2026