Land adjacent 1 Greengate Lane, SOUTH KILLINGHOLME Data via plota.co.uk

PA/2026/1064 - Removal/variation of conditions Pending

Proposal

Planning permission to vary condition 2 of namely changes to the roof to install two dormer windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 24 Sept 2026
Decision
Expected by 19 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 12 Nov 2026, from North Lincs's recent extensions.

Comments are open until 15 Oct 2026

Comment on this application ↗

Associated applications 2

  • Part of

    Amendmentcouncil archive

    Conditions variation sought for 2

    • VariationPlanning permission to vary condition 2 namely changes to the roof to install two dormer windowsThis applicationPA/2026/1064

Site constraints 3

National infrastructure project 83 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 83 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 83 m); A160 - A180 Port of Immingham Improvement (decided, 202 m); Viking CCS Pipeline (decided, 550 m); VPI Immingham OCGT (decided, 601 m); Able Marine Energy Park (decided, 1909 m); Able Marine Energy Park Material Change 2 (decided, 1909 m); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary); Humber Carbon Capture Pipeline (at pre-application, 142 m); Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, 409 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the South Killingholme built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Removal/variation of conditions
Received
around 24 Sept 2026
Validated
24 Sept 2026
Ward
Ferry
Parish
South Killingholme
Case officer
Show

Decision outlook

Day 15 of the 56-day target. North Lincs usually decides extensions by day 49.

Day 1541 days to the 56-day target
77%decided within 8 weeks
96%approved
212decided in the last year

Plota live figures for extensions decided by North Lincs in the last twelve months, from validation. North Lincs decision record →

Consultation & key dates

Comments by
15 Oct 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 councils
Relevant to this application:
Householder decisions

North Lincs ranks #123 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026