Tourist Information Centre Pier Approach Bournemouth BH2 5AA Data via plota.co.uk

P/25/04125/FUL - Full Planning Permission Refused

Proposal

Change of use from Visitor Information Centre (Class E) to Takeaway (Sui Generis) for the sale of hot and cold food, ice cream, and paninis without the need for extraction or ventilation equipment. Works include replacement of existing signage with new rear-illuminated signage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2025
✓
Validated
16 Oct 2025
✗
Refused
28 Jan 2026
Appeal
Not lodged

Refused on 28 Jan 2026 · Delegated · Last checked 10 Oct 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area about 70 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Registered park or garden about 93 m away: Upper, Central and Lower Pleasure Gardens, and Coy Pond Gardens
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
SSSI about 245 m away: Poole Bay Cliffs SSSI; Inside the Bournemouth built-up area; Priority habitat about 40 m away: Maritime cliff and slope.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH2 5AA
Received
14 Oct 2025
Validated
16 Oct 2025
Ward
Bournemouth Central
Case officer
Show
Decision
Refused
Decision date
28 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
Shore Architecture

How this decision compares

Decided in 104 days from validation, 24 days slower than BCP's median of 80 for full applications. Refused, as 22% of full applications here are.

31%decided within 8 weeks
78%approved
760decided in the last year

Plota live figures for full applications decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Consultation
21 Nov 2025
Comments by
12 Dec 2025
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Change of use

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026