Lancing Manor Leisure Centre Lancing Manor Manor Road Lancing West Sussex BN15 0PH Data via plota.co.uk

AWDM/1107/26 - Full Application Registered

Proposal

Installation of three padel courts on existing astroturf football pitch and associated works, including floodlighting. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
✓
Consultation
18 Sept 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 67.

The consultation period closed on 13 Oct 2026.

Documents 39

Consultation & comments 26

PDF Consultation Response Consultation Response · 10 Nov 2026 View ↗ PDF Representation Representation · 5 Nov 2026 View ↗ PDF Consultation Response Consultation Response · 19 Oct 2026 View ↗ PDF Consultation Response Consultation Response · 9 Oct 2026 View ↗ PDF Representation Representation · 8 Oct 2026 View ↗ PDF Representation Representation · 8 Oct 2026 View ↗ PDF Representation Representation · 8 Oct 2026 View ↗ PDF Consultation Response Consultation Response · 6 Oct 2026 View ↗ PDF Representation Representation · 6 Oct 2026 View ↗ PDF Consultation Response Consultation Response · 29 Sept 2026 View ↗ PDF Consultation Response Consultation Response · 28 Sept 2026 View ↗ PDF Representation Representation · 28 Sept 2026 View ↗ PDF Representation Representation · 25 Sept 2026 View ↗ PDF SOUTHERN WATER CONSULTATION RESPONSE-MAP Consultation Response · 24 Sept 2026 View ↗ PDF SOUTHERN WATER CONSULTATION RESPONSE Consultation Response · 24 Sept 2026 View ↗ PDF Representation Representation · 23 Sept 2026 View ↗ PDF Representation Representation · 23 Sept 2026 View ↗ PDF Representation Representation · 23 Sept 2026 View ↗ PDF Representation Representation · 23 Sept 2026 View ↗ PDF Representation Representation · 23 Sept 2026 View ↗ PDF Representation Representation · 22 Sept 2026 View ↗ PDF Representation Representation · 22 Sept 2026 View ↗ PDF Representation Representation · 22 Sept 2026 View ↗ PDF Representation Representation · 22 Sept 2026 View ↗ PDF Representation Representation · 22 Sept 2026 View ↗ PDF Neighbours Notified Neighbours Notified · 18 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 7

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Local nature reserve about 368 m away: Lancing Ring; Conservation area about 67 m away: North Lancing; National park about 373 m away: South Downs; 1 listed building within 150 m of the postcode pin; Inside the Lancing and Sompting built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Adur - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Adur
Application type
Full Application
Postcode
BN15 0PH
Received
17 Sept 2026
Validated
17 Sept 2026
Ward
Manor
Parish
Lancing Parish Council
Case officer
Show
Target decision
11 Dec 2026
Agent
D&M Planning Ltd

Decision outlook

Day 67, past the statutory target. 91% of commercial premises in Adur are decided within thirteen weeks, which runs to 17 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 6711 days past the 56-day target
65%decided within 8 weeks
94%approved
6%go to committee

Plota live figures for commercial premises decided by Adur in the last twelve months, from validation. Adur decision record →

Public comments

17comments received
17 objecting

100% object · above the UK average of 74%

12 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15229173
Planning Portal ref
PP-15229173
Neighbours
18 Sept 2026
Consultation
18 Sept 2026
Comments by
13 Oct 2026
Site or press notice
22 Sept 2026
Statutory expiry
12 Nov 2026
Env. assessment
No
Adur
Planning Authority Score
6/10
Average
#103 of 296 overall
Relevant to this application:
Householder decisions

Adur is #181 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Adur decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #49 of 296
96%
Householder approved
Above avg (90%) #48 of 296
60%
Decided in 8 weeks
Below avg (63%) #181 of 296
38%
Extended time limit
Below avg (41%) #125 of 296
70%
Minor dwellings approved
20 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
100%
Change of use approved
5 decided
298
Total decisions
20 refused in the year to March 2026