Tower Of London, Historic Royal Palaces, Tower Hill, London, EC3N 4AB Data via plota.co.uk

PA/25/01035/NC - Full Planning Permission Approved

Proposal

Removal of the existing shelter and stair. Creation of a new Moat access ramp, new sentry, associated landscape works, and other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 10 Jun 2025
✓
Consultation
17 Jun 2025
✓
Approved
24 Dec 2025

Approved on 24 Dec 2025 · Delegated · Last checked 16 Nov 2026

Documents 54

Plans & drawings 31

PDF HABITAT MANAGEMENT AND MONITORING PLAN - UPDATED Report · 14 Jul 2025 View ↗ PDF TOL646-GRA-03-XX-DR-L-5101 REV P01 SOFTWORKS PROPOSED GENERAL ARRANGEMENT PLAN Current Plan · 14 Jul 2025 View ↗ PDF TOL-PA02-001 A SITE LOCATION PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-011 A EXISTING GROUND FLOOR PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-033 A EXISTING EAST BRIDGE ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-070 A DEMOLITION NORTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-111 A PROPOSED GROUND FLOOR PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-133 A PROPOSED EAST BRIDGE ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL646 GRA-03-XX-DR-L-4101 P00 SOILING WORKS PROPOSED GENERAL ARRANGEMENT PLAN Current Plan · 10 Jun 2025 View ↗ PDF 243442-PUR-02-XX-DR-A-0130 COSERVATION REPAIRS & WORKS TO HISTORIC FABRIC RAMP, STAIR AND SENTY BOX DEMOLITION ELEVATION AND SECTION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-010 A EXISTING MOAT LEVEL PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-031 A EXISTING SOUTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-052 A ROOF DEMOLITION PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-110 A PROPOSED MOAT LEVEL PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-131 A PROPOSED SOUTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL646 GRA-03-XX-DR-L-310 P00 HARDWORKS PROPOSED GENERAL ARRANGEMENT PLAN Current Plan · 10 Jun 2025 View ↗ PDF 21996P-105 PROPOSED MOAT RAMP STRUCTURAL DETAILS SHEET 1 Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-003 A ELEVATION KEY PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-030 A EXISTING NORTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-051 A DEMOLITION GROUND FLOOR PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-073 A DEMOLITION EAST BRIDGE ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-130 A PROPOSED NORTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL646 GRA-03-XX-DR-L-1401 P00 PROPOSED GENERAL ARRANGEMENT SECTION 1 Current Plan · 10 Jun 2025 View ↗ PDF 21996P-104 PROPOSED MOAT RAMP FOUNDATION DETAILS Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-002 A EXISTING BLOCK GROUND FLOOR PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-012 A EXISTING ROOF PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-050 A DEMOLITION MOAT LEVEL PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-0711 A DEMOLITION SOUTH ELEVATION Current Plan · 10 Jun 2025 View ↗ PDF TOL-PA02-112 A PROPOSED ROOF PLAN Current Plan · 10 Jun 2025 View ↗ PDF TOL646 GRA-03-XX-DR-L-1000 P00 PROPOSED GENERAL ARRANGEMENT PLAN Current Plan · 10 Jun 2025 View ↗ PDF 243442-PUR-02-XX-DR-A-0301 COSERVATION REPAIRS & WORKS TO HISTORIC FABRIC DETAIL - INTERFACE OF PROPOSED RAMP WITH SOUTH REVETMENT WALL Current Plan · 10 Jun 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 11

Scheduled monument: Tower of London
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade I listed: Tower of London (Inner curtain wall with mural towers, the New Armouries, the King's House and Tower Green)
List entry 1242062 · The pin is inside its outline · 13 more listed buildings within 150 m (5 Grade I, 2 Grade II*, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 13 with distances
Historic England ↗
World heritage site: Tower of London
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
The Tower conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 880 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 1.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Wider setting of protected view 25A.1 City Hall to the White Tower; Inside the Tower Hamlets built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
EC3N 4AB
Received
around 10 Jun 2025
Validated
10 Jun 2025
Ward
St Katharines and Wapping
Case officer
Show
Target decision
24 Dec 2025
Decision
Permit
Decision date
24 Dec 2025
Decision level
Delegated
Applicant
Show
Agent
The Planning Lab

How this decision compares

Decided in 197 days from validation, 141 days slower than Tower Hamlets's median of 56 for full applications. Approved, as 86% of full applications here are.

60%decided within 8 weeks
86%approved
623decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
17 Jun 2025
Consultation
17 Jun 2025
Comments by
8 Jul 2025
Site or press notice
27 Jun 2025
Statutory expiry
5 Aug 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026