Land East Of Dorchester Road Cerne Abbas Data via plota.co.uk

P/ESC/2026/05109 - EIA Screening Opinion Out To Consultation

Proposal

EIA Screening Opinion Request submitted on behalf of Scottish and Southern Electricity Networks (SSEN) in respect of a proposed new primary substation and associated access at Cerne Abbas, Dorset (NGR: ST 66248 0073). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
Decision
Expected by 10 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 4 Nov 2026 and 14 Nov 2026, from Dorset's recent utility and infrastructure works.

Site constraints 6

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Dorset National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special area of conservation 401 m away: Cerne & Sydling Downs; SSSI 401 m away: Black Hill Down SSSI.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
EIA Screening Opinion
Received
15 Sept 2026
Validated
15 Sept 2026
Ward
Chalk Valleys Ward
Parish
Cerne Abbas
Case officer
Show
Applicant
Show
Agent
Charlotte Hopkins

Decision outlook

Day 20 of the 56-day target. Dorset usually decides utility and infrastructure works by day 55.

Day 2036 days to the 56-day target
59%decided within 8 weeks
93%approved
95decided in the last year

Plota live figures for utility and infrastructure works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026