Froghall Farm, SPITTAL, Haverfordwest, Pembrokeshire, SA62 5RF Data via plota.co.uk

25/1045/PA - Retrospective S73A Invalid

Proposal

Storage of caravans, boats, cars and farm machinery in 4 sheds and associated hard standing (in retrospect). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 17 Mar 2026
✓
Consultation
18 Sept 2026
Decision
Expected by 5 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 30 Sept 2026; it is now day 206.

The consultation period closed on 30 Sept 2026.

Site constraints 11

Withybush All DevsWBush Sgrd Zone +45mCatchment Sir Thomas PictonCatchment Spittal VCSAC_PhosphorusRiver_PhosphSurface water flood riskPolicy SP.9 Welsh Language
Nutrient neutrality catchment: Afon Cleddau
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Withybush All DevsCouncil record
Recorded by the council for this site.
Council site ↗
WBush Sgrd Zone +45mCouncil record
Recorded by the council for this site.
Council site ↗
Catchment Sir Thomas PictonCouncil record
Recorded by the council for this site.
Council site ↗
Catchment Spittal VCCouncil record
Recorded by the council for this site.
Council site ↗
SAC_PhosphorusCouncil record
Recorded by the council for this site.
Council site ↗
River_PhosphCouncil record
Recorded by the council for this site.
Council site ↗
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Policy SP.9 Welsh LanguageCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Pembrokeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Retrospective S73A
Postcode
SA62 5RF
Received
around 17 Mar 2026
Validated
17 Mar 2026
Ward
Rudbaxton And Spittal
Case officer
Show
Target decision
5 Oct 2026
Decision level
Decision to be made by committee
Applicant
Show
Agent
A.D Architectural Design Consultants LTD

Decision outlook

Day 206, past the statutory target. 96% of agricultural works in Pembrokeshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 206150 days past the 56-day target
94%decided within 8 weeks
79%approved
63decided in the last year

Plota live figures for agricultural works decided by Pembrokeshire in the last twelve months, from validation. Pembrokeshire decision record →

Consultation & key dates

Alt. reference
PP-14758841
Comments by
30 Sept 2026
Site or press notice
16 Sept 2026
Statutory expiry
30 Sept 2026