Land to the south east of Sunny Bank Cottage, Little Langdale, Ambleside, LA22 9PA Data via plota.co.uk

7/2026/5112 - Full Planning application Approved

Proposal

Replacement of existing septic tank with sewage treatment plant installation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Feb 2026
✓
Validated
3 Mar 2026
✓
Consultation
13 Mar 2026
✓
Approved
6 Aug 2026
✓
Committee
2 Sept 2026

Approved on 6 Aug 2026 · Committee · Last checked 6 Aug 2026

Planning committee

Decided by Lake District Development Control Committee on 2 Sept 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the plant would reduce pollution and minimise disturbance to protected sites, subject to conditions.
  • The parish council had no objections, Natural England supported the replacement subject to safeguards, and no representation letters were received.
  • Members unanimously approved the application with conditions.
Read how the committee decided The proposed works, protected-site impacts, consultation responses, officer advice and committee decision.

Source: Plota analysis of Lake District's committee minutes of 2 Sept 2026.

Site constraints 18

Water Supply and WasteArea of special control for advertsPrevious planning applicationsMineral Safeguarding AreaPolicy 01 Support - National and international significance of the Lake DistrictPolicy 02 Support - Spatial strategeyPolicy 05 Support - Protecting the spectacular landscapePolicy 04 Support - Biodiversity and geodiversityPolicy 06 Support - Design and developmentPolicy 28 Support - Minerals Safeguarding Area
Special area of conservation: North Pennine Dales Meadows
Internationally or nationally protected for its wildlife. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: Wilson Place Meadows SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Lake District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
World heritage site: The English Lake District
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Priority habitat: Upland hay meadow
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Upland hay meadow
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Water Supply and WasteCouncil record
Recorded by the council for this site.
Council site ↗
Area of special control for advertsCouncil record
Recorded by the council for this site.
Council site ↗
Previous planning applicationsCouncil record
Recorded by the council for this site.
Council site ↗
Mineral Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Policy 01 Support - National and international significance of the Lake DistrictCouncil record
Recorded by the council for this site.
Council site ↗
Policy 02 Support - Spatial strategeyCouncil record
Recorded by the council for this site.
Council site ↗
Policy 05 Support - Protecting the spectacular landscapeCouncil record
Recorded by the council for this site.
Council site ↗
Policy 04 Support - Biodiversity and geodiversityCouncil record
Recorded by the council for this site.
Council site ↗
Policy 06 Support - Design and developmentCouncil record
Recorded by the council for this site.
Council site ↗
Policy 28 Support - Minerals Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lake District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning application
Postcode
LA22 9PA
Received
26 Feb 2026
Validated
3 Mar 2026
Ward
Windermere and Ambleside Ward
Parish
Lakes
Case officer
Show
Target decision
22 Apr 2026
Decision
Approved with Conditions
Decision date
6 Aug 2026
Decision level
Committee
Applicant
Show
Agent
Jeffrey & Rigg Ltd

How this decision compares

Decided in 156 days from validation, 107 days slower than Lake District's median of 49 for utility and infrastructure works. Approved, as 95% of utility and infrastructure works here are.

69%decided within 8 weeks
95%approved
69decided in the last year

Plota live figures for utility and infrastructure works decided by Lake District in the last twelve months, from validation. Lake District decision record →

Consultation & key dates

Alt. reference
PP-14734861
Site or press notice
13 Mar 2026
Committee
5 Aug 2026
Statutory expiry
3 Sept 2026