26/02496/LB - Listed Building Consent Awaiting decision

Proposal

Listed Building Consent and Full Planning Permission for the reinstatement and retention of the original separate layouts of Flat 121C and Flat 123A, including internal alterations, reinstatement of the first-floor party wall, refurbishment and replacement of internal doors; retention of existing secondary glazing to windows; retention of existing air-conditioning units serving Flats 123C, 123B and 124B; installation of a new external air-conditioning unit to serve Flat 121C; and associated repair and refurbishment works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Aug 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 79.

The consultation period closed on 9 Oct 2026.

Associated applications 2

Site constraints 10

19 listed buildings within 150 m of the postcode pin
Nearest: 95-123, Stamford Street Se1, Grade II, the postcode pin is inside its outline · 17 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 19 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Waterloo conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 135 m away: Thames Tideway Tunnel
The site is about 135 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 169 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Lambeth built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 60 m away: Waterloo.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lambeth
Application type
Listed Building Consent
Postcode
SE1 9NN
Received
31 Aug 2026
Validated
31 Aug 2026
Case officer
Show
Target decision
26 Nov 2026
Applicant
Show
Agent
AK-Studios

Decision outlook

Day 79, past the statutory target. 90% of extensions in Lambeth are decided within thirteen weeks, which runs to 30 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 7923 days past the 56-day target
60%decided within 8 weeks
81%approved
951decided in the last year

Plota live figures for extensions decided by Lambeth in the last twelve months, from validation. Lambeth decision record →

Public comments

No public comments yet.

40 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
9 Oct 2026
Statutory expiry
26 Oct 2026
Env. assessment
No
Lambeth
Planning Authority Score
2.7/10
Poor
#242 of 296 councils
Relevant to this application:
Other decisions

Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Lambeth decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #274 of 296
81%
Householder approved
Below avg (90%) #273 of 296
62%
Decided in 8 weeks
Below avg (63%) #164 of 296
47%
Extended time limit
Above avg (41%) #209 of 296
46%
Minor dwellings approved
70 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
42%
Change of use approved
53 decided
1,784
Total decisions
396 refused in the year to March 2026