2 Rutland Road Bournemouth BH9 1EQ Data via plota.co.uk

P/26/04622/FUL - Full Planning Permission Application Under Consideration

Proposal

Change of use to Class B2 vehicle repair workshop and MOT Station, new single storey link from reception building to workshop, new workshop roof, installation of solar PV panels and ventilation system with ducting and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 18 Nov 2026 and 29 Nov 2026, from BCP's recent changes of use.

Comments are open until 22 Oct 2026

Comment on this application ↗

Documents 22

Plans & drawings 17

PDF Proposed Office Building Elevations 3724 TA V1 ZZ DR A 0277 - P01 · 23 Sept 2026 View ↗ PDF 3724 TA V1 ZZ DR A 0225 - P01 Proposed Sections AA & BB · 23 Sept 2026 View ↗ PDF Proposed Workshop East & West Elevations 3724 TA V1 ZZ DR A 0276 - P01 · 23 Sept 2026 View ↗ PDF Proposed Workshop North & South Elevations 3724 TA V1 ZZ DR A 0275 - P01 · 23 Sept 2026 View ↗ PDF Existing Office Building Elevations 3724 TA V1 ZZ DR A 0252 - P01 · 23 Sept 2026 View ↗ PDF Existing Workshop North & South Elevations 3724 TA V1 ZZ DR A 0250 - P01 · 23 Sept 2026 View ↗ PDF Existing Workshop East & West Elevations 3724 TA V1 ZZ DR A 0251 - P01 · 23 Sept 2026 View ↗ PDF 3724 TA V1 ZZ DR A 0003 - P01 Parking Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 ZZ DR A 0200 - P01 Existing Sections AA & BB · 23 Sept 2026 View ↗ PDF Proposed Location & Site Plan 3724 TA V1 SW DR A 0002 - P01 · 23 Sept 2026 View ↗ PDF Existing Location & Site Plan 3724 TA V1 SW DR A 0001 - P01 · 23 Sept 2026 View ↗ PDF 3724 TA V1 01 DR A 0101 - P01 Existing First Floor Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 01 DR A 0151 - P01 Proposed Roof Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 01 DR A 0100 - P01 Existing Ground Floor Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 01 DR A 0151 - P01 Proposed First Floor Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 01 DR A 0150 - P01 Proposed Ground Floor Plan · 23 Sept 2026 View ↗ PDF 3724 TA V1 RF DR A 0102 - P01 Existing Roof Plan · 23 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 1

Also on the record
Inside the Bournemouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH9 1EQ
Received
23 Sept 2026
Validated
23 Sept 2026
Ward
Winton East
Parish
Bournemouth Town Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Trinity Architecture Ltd
Freehold owner
Show

Decision outlook

Day 15 of the 56-day target. BCP usually decides changes of use by day 56.

Day 1541 days to the 56-day target
51%decided within 8 weeks
74%approved
123decided in the last year

Plota live figures for changes of use decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Consultation
24 Sept 2026
Comments by
22 Oct 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Change of use

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.