Balado Bridge Poultry Farm Balado Data via plota.co.uk

25/01453/FLM - planning permission major Approved

Proposal

Demolition of and erection of replacement poultry units and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2025
✓
Validated
21 Oct 2025
✓
Approved
19 Oct 2026

Approved on 19 Oct 2026 · Committee Decision · Last checked 23 Oct 2026

Planning committee

Decided by Perth Planning and Placemaking Committee on 14 Oct 2026.

Approved

As officers recommended.

  • Officers advised approval because the proposal complied with the Development Plan and would not cause unacceptable impacts.
  • Balado Airfield, Kinross Community Council and one further representation raised odour, visual, tourism, biodiversity, noise and environmental concerns.
  • The committee granted permission subject to conditions and informatives, finding no material considerations justifying refusal.
Read how the committee decided The proposal, site history, officers’ assessment, objections, speakers, conditions and committee decision.

Source: Plota analysis of Perth's committee minutes of 14 Oct 2026.

Documents 92

Statements & assessments 27

PDF FINAL FLOODS TEAM COMMENTS Internal Consultees · 3 Aug 2026 View ↗ PDF 73 ARBORICULTURAL IMPACT ASSESSMENT VERSION 2 Report · 14 May 2026 View ↗ PDF EXTERNAL CONSULTATION FROM PERTH AND KINROSS HERITAGE TRUST External Consultees · 12 Nov 2025 View ↗ PDF TRANSPORTATION AND DEVELOPMENT Internal Consultees · 10 Nov 2025 View ↗ PDF 64 DRAINAGE STRATEGY REPORT 1 OF 5 Report · 21 Oct 2025 View ↗ PDF 68 DRAINAGE STRATEGY REPORT 1 OF 6 Report · 21 Oct 2025 View ↗ PDF 65 DRAINAGE STRATEGY REPORT 2 OF 5 Report · 21 Oct 2025 View ↗ PDF 66 DRAINAGE STRATEGY REPORT 3 OF 6 Report · 21 Oct 2025 View ↗ PDF 67 DRAINAGE STRATEGY REPORT 4 OF 6 Report · 21 Oct 2025 View ↗ PDF 69 DRAINAGE STRATEGY REPORT 5 OF 5 Report · 21 Oct 2025 View ↗ PDF 70 DRAINAGE LAYOUT PLAN 2 OF 3 Drawing · 21 Oct 2025 View ↗ PDF 71 DRAINAGE LAYOUT PLAN 3 OF 3 Drawing · 21 Oct 2025 View ↗ PDF 69 DRAINAGE LAYOUT PLAN 1 OF 3 Drawing · 21 Oct 2025 View ↗ PDF 54 EIA - APPENDIX 11 - TRANSPORT STATEMENT Report · 8 Oct 2025 View ↗ PDF 53 EIA - APPENDIX 10 - TREE SURVEY Report · 30 Sept 2025 View ↗ PDF 42 EIA - APPENDIX 3 - DRAINAGE PROPOSAL STATEMENT - PART 1 Report · 30 Sept 2025 View ↗ PDF 26 DRAINAGE PROPOSAL STATEMENT - PART 2 Drawing · 30 Sept 2025 View ↗ PDF 43 EIA - APPENDIX 4 - FLOOD RISK ASSESSMENT Report · 30 Sept 2025 View ↗ PDF 51 EIA - APPENDIX 9 - ECOLOGY REPORT Report · 30 Sept 2025 View ↗ PDF 52 EIA - APPENDIX 9 - MAP 1 - PHASE 1 HABITAT SURVEY Drawing · 30 Sept 2025 View ↗ PDF 34 BALADO ECOLOGY REPORT Report · 30 Sept 2025 View ↗ PDF 29 BALADO POULTRY FARM CULTURAL HERITAGE FIGURE 1 Drawing · 30 Sept 2025 View ↗ PDF 60 DESIGN AND ACCESS STATEMENT Report · 30 Sept 2025 View ↗ PDF 61 EIA - CHAPTER CULTURAL HERITAGE AND ARCHAEOLOGY Report · 30 Sept 2025 View ↗ PDF 62 EIA - ENVIRONMENTAL STATEMENT Report · 30 Sept 2025 View ↗ PDF 63 FLOOD RISK ASSESSMENT Report · 30 Sept 2025 View ↗ PDF 27 MAP 1 PHASE 1 HABITAT SURVEY Drawing · 30 Sept 2025 View ↗

Plans & drawings 31

PDF RE - DESIGN OF BUILDING - AMMONIA Drawing · 7 Sept 2026 View ↗ PDF 72 EIA - NON TECHNICAL SUMMARY Drawing · 26 Nov 2025 View ↗ PDF 23 SILO BASE Drawing · 13 Oct 2025 View ↗ PDF 55 EIA - APPENDIX 12 - CONSTARUCTION TRAFFIC MANAGEMENT PLAN Report · 8 Oct 2025 View ↗ PDF 04 EXISTING LOCATION PLAN Drawing · 3 Oct 2025 View ↗ PDF 05 PROPOSED LOCATION PLAN Drawing · 3 Oct 2025 View ↗ PDF 10 EXISTING AND PROPOSED BRIDGE SITE PLAN Drawing · 3 Oct 2025 View ↗ PDF 08 EXISTING AND PROPOSED CENTRAL SITE PLAN Drawing · 3 Oct 2025 View ↗ PDF 06 EXISTING AND PROPOSED NORTH SITE PLAN Drawing · 3 Oct 2025 View ↗ PDF 07 EXISTING AND PROPOSED TOLL SITE PLAN Drawing · 3 Oct 2025 View ↗ PDF 09 EXISTING ELEVATIONS Drawing · 3 Oct 2025 View ↗ PDF 17 PROPOSED ELEVATIONS Drawing · 3 Oct 2025 View ↗ PDF 13 EXISTING AND PROPOSED SITE ELEVATIONS Drawing · 3 Oct 2025 View ↗ PDF 22 CONSULTATION PLAN Drawing · 3 Oct 2025 View ↗ PDF 01 RURAL LOCATION PLAN Drawing · 3 Oct 2025 View ↗ PDF 16 EXISTING AND PROPOSED BRIDGE SITE SECTIONS Drawing · 3 Oct 2025 View ↗ PDF 14 EXISTING AND PROPOSED NORTH SITE SECTIONS Drawing · 3 Oct 2025 View ↗ PDF 15 EXISTING AND PROPOSED CENTRAL TOLL SITE SECTIONS Drawing · 3 Oct 2025 View ↗ PDF 21 CMP PLAN Drawing · 3 Oct 2025 View ↗ PDF 38 PROPOSED GAS TANKS Drawing · 3 Oct 2025 View ↗ PDF 18 PROPOSED FEED BINS Drawing · 3 Oct 2025 View ↗ PDF 11 EXISTING AND PROPOSED FLOOR PLANS Drawing · 3 Oct 2025 View ↗ PDF 12 EXISTING AND PROPOSED ROOF PLANS Drawing · 3 Oct 2025 View ↗ PDF 40 EIA - APPENDIX 2 - INEOS FPS LAYOUT BALADO POULTRY FARM Report · 30 Sept 2025 View ↗ PDF 19 SITE OFFICE AND LAYOUT AND ELEVATIONS Drawing · 30 Sept 2025 View ↗ PDF 28 INEOS FPS LAYOUT BALADO POULTRY FARM Drawing · 30 Sept 2025 View ↗ PDF 02 LOCATION PLAN Drawing · 30 Sept 2025 View ↗ PDF 25 POULTRY HOUSE 2 AND 3 SECTION ELEVATIONS Drawing · 30 Sept 2025 View ↗ PDF 03 SUPPLEMENTARY LOCATION PLAN Drawing · 30 Sept 2025 View ↗ PDF 20 WASTE WATER STORAGE TANK PUMP HOUSE Drawing · 30 Sept 2025 View ↗ PDF 24 WASTE WATER STORAGE TANK Drawing · 30 Sept 2025 View ↗

Other documents 21

PDF REPORT OF HANDLING Report · 5 Oct 2026 View ↗ PDF AIR QUALITY TECHNICAL BRIEF Report · 1 Sept 2026 View ↗ PDF 56 EIA - APPENDIX 14 - BALADO RADIOLOGICAL WALKOVER REPORT - SEPTEMBER 2025 Report · 30 Sept 2025 View ↗ PDF 57 EIA - APPENDIX 15 - CONSTRUCTION MANAGEMENT TIMETABLE Report · 30 Sept 2025 View ↗ PDF 44 EIA - APPENDIX 5 - ODOUR REPORT Report · 30 Sept 2025 View ↗ PDF 45 EIA - APPENDIX 6 - DUST REPORT Report · 30 Sept 2025 View ↗ PDF 46 EIA - APPENDIX 7 - BALADO_AMMONIA_REPORT_SY140425 Report · 30 Sept 2025 View ↗ PDF 50 EIA - APPENDIX 8 - BALADO LVIA 20082025 Report · 30 Sept 2025 View ↗ PDF 47 EIA - APPENDIX 8 - BALADO LVIA GRAPHICS PART 1 OF 3 - METHODOLOGY AND BASELINE F Report · 30 Sept 2025 View ↗ PDF 48 EIA - APPENDIX 8 - BALADO LVIA GRAPHICS PART 2 OF 3 Report · 30 Sept 2025 View ↗ PDF 49 EIA - APPENDIX 8 - BALADO LVIA GRAPHICS PART 3 OF 3 Report · 30 Sept 2025 View ↗ PDF 33 BALADO DUST REPORT SGS271224 Report · 30 Sept 2025 View ↗ PDF 39 BALADO LVIA 20-08-2025 Report · 30 Sept 2025 View ↗ PDF 30 BALADO LVIA GRAPHICS PART 1 OF 3 METHODOLOGY AND BASELINE FIGURES Report · 30 Sept 2025 View ↗ PDF 31 BALADO LVIA GRAPHICS PART 2 OF 3 Report · 30 Sept 2025 View ↗ PDF 32 BALADO LVIA GRAPHICS PART 3 OF 3 Report · 30 Sept 2025 View ↗ PDF 37 BALADO ODOUR REPORT SGS271224 Report · 30 Sept 2025 View ↗ PDF 36 BALADO POULTRY UNITFINAL1 Report · 30 Sept 2025 View ↗ PDF 35 BALADO RADIOLOGICAL WALKOVER REPORT SEPTEMBER 2025 Report · 30 Sept 2025 View ↗ PDF 59 CONSTRUCTION MANAGEMENT TIMETABLE Report · 30 Sept 2025 View ↗ PDF 58 EIA - TECHNICAL APPENDIX 1 Report · 30 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 1

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
planning permission major
Received
30 Sept 2025
Validated
21 Oct 2025
Ward
Kinross-shire
Parish
Kinross
Case officer
Show
Decision
Approve the application
Decision date
19 Oct 2026
Decision level
Committee Decision
Applicant
Show

How this decision compares

Decided in 363 days from validation, 306 days slower than Perth's median of 57 for full applications. Approved, as 92% of full applications here are.

48%decided within 8 weeks
92%approved
835decided in the last year

Plota live figures for full applications decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Comments by
20 Nov 2025
Env. assessment
No