Land To The West Of Shire Lane And North Of The A3052 Uplyme Data via plota.co.uk

26/0428/FUL - Full Application Approved

Proposal

Siting of temporary construction compound (for 18 months) including widening of existing field access, to assist with offsite sewage upgrade works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Mar 2026
✓
Approved
11 Jun 2026

Approved on 11 Jun 2026 · Delegated Decision · Last checked 7 Jul 2026

Site constraints 6

East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Public footpath about 1 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Lyme Regis built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
DT7 3EU
Received
11 Mar 2026
Validated
11 Mar 2026
Ward
Trinity
Parish
Uplyme
Target decision
12 Jun 2026
Decision
Approval with conditions
Decision date
11 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
NPT Engineering & Environmental Ltd

How this decision compares

Decided in 92 days from validation, 49 days slower than East Devon's median of 43 for utility and infrastructure works. Approved, as 94% of utility and infrastructure works here are.

72%decided within 8 weeks
94%approved
72decided in the last year

Plota live figures for utility and infrastructure works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Consultation & key dates

Alt. reference
PP-14638285
Planning Portal ref
PP-14638285
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026