2 - 4 Rancorn Road, Margate, Kent, CT9 5DG Data via plota.co.uk

F/TH/26/0783 - Full Planning Permission Pending Consideration

Proposal

Erection of four storey building containing 3no. 1 bed and 6no. 2 bed flats together with associated works and provision of cycle spaces following demolition of existing building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Validated
9 Sept 2026
Decision
Expected by 4 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 4 Nov 2026, from Thanet's recent demolitions.

Site constraints 6

Article 4 direction
Birchington & Rural ED. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Public footpath about 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special area of conservation about 147 m away: Thanet Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 147 m away: Thanet Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Inside the Margate built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 23 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thanet - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thanet
Application type
Full Planning Permission
Postcode
CT9 5DG
Received
29 Jul 2026
Validated
9 Sept 2026
Ward
Westbrook
Case officer
Show
Target decision
4 Nov 2026
Decision level
Delegated decision
Applicant
Show
Agent
Contour Planning

Decision outlook

Day 25 of the 56-day target. Thanet usually decides demolitions by day 56.

Day 2531 days to the 56-day target
60%decided within 8 weeks
95%approved
135decided in the last year

Plota live figures for demolitions decided by Thanet in the last twelve months, from validation. Thanet decision record →

Consultation & key dates

Statutory expiry
4 Nov 2026
Thanet
Planning Authority Score
4.5/10
Below average
#175 of 296 councils
Relevant to this application:
Householder decisions

Thanet ranks #171 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Thanet decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #103 of 296
94%
Householder approved
Above avg (90%) #122 of 296
62%
Decided in 8 weeks
Below avg (63%) #171 of 296
45%
Extended time limit
Above avg (41%) #196 of 296
79%
Minor dwellings approved
105 decided (1-9 homes)
85%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
50 decided
751
Total decisions
67 refused in the year to March 2026