Yard 2, Brynteg Garage, Llannon Road, Upper Tumble, Llanelli, SA14 6BT Data via plota.co.uk

PL/11434 - Full planning permission In Review

Proposal

Change of use to concrete mixing yard, to include the erection and operation of a concrete batching plant for the production of ready mix concrete for the construction industry Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
23 Sept 2026
Decision
Expected by 15 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision by 3 Dec 2026, from Carmarthenshire's recent changes of use.

The consultation period closed on 2 Nov 2026.

Site constraints 2

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA14 6BT
Received
18 Sept 2026
Validated
23 Sept 2026
Ward
Llannon
Parish
Llannon
Case officer
Show
Target decision
15 Jan 2027

Decision outlook

Day 61, past the statutory target. 76% of changes of use in Carmarthenshire are decided within thirteen weeks, which runs to 23 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 20 Nov 2026.

Day 615 days past the 56-day target
51%decided within 8 weeks
73%approved
88decided in the last year

Plota live figures for changes of use decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
2 Nov 2026