Bootham School 61 Bootham York YO30 7BT Data via plota.co.uk

26/00851/LBC - Listed Building Consent Awaiting decision

Proposal

Internal refurbishment, repairs, and removal of C20 partitions and replace with new fire rated partitions to ground floor, first floor and second floor, infilling and opening doorways, removal of modern window and enlargement of existing window to form doorway at 61 Bootham to accommodate teaching classrooms, small learning spaces, offices, and sanitary facilities . External works to nos.59 and 61 Bootham to repair and repaint windows, timber work and rainwater goods, repointing, repairs and replacement of defective masonry, localised structural repairs stone and metal works and installation of new ventilation grilles. Data via plota.co.uk

View original council record ↗

Application progress

Received
11 May 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 94

Plans & drawings 82

PDF BUILDING NO61 NW SIDE ELEVATION Drawing · 8 May 2026 View ↗ PDF BUILDING NO61 SE SIDE ELEVATION Drawing · 8 May 2026 View ↗ PDF AWP DOCUMENT ISSUE REGISTER Drawing · 8 May 2026 View ↗ PDF BUILDING NO59 REAR ELEVATION Drawing · 8 May 2026 View ↗ PDF BUILDING NO61 SW FRONT ELEVATION Drawing · 8 May 2026 View ↗ PDF BUILDING NO61 NE REAR ELEVATION Drawing · 8 May 2026 View ↗ PDF Location Plan Location Plan · 8 May 2026 View ↗ PDF SITE LAYOUT PLAN Drawing · 8 May 2026 View ↗ PDF SITE LOGISTICS PLAN Drawing · 8 May 2026 View ↗ PDF BASEMENT G.A. BUILDERS WORKS Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - BUILDERS WORKS Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - BUILDERS WORK Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - BUILDERS WORKS Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - BUILDERS WORKS Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - CEILING / WALL FINISHES Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - CEILING / WALL / FINISHES Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - CEILING / WALL FINISHES Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - CEILING - WALL FINISHES Drawing · 8 May 2026 View ↗ PDF BASEMENT CEILING AND WALL FINISHES Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR DEMOLITION Drawing · 8 May 2026 View ↗ PDF ROOF PLAN Drawing · 8 May 2026 View ↗ PDF ALL FLOORS - WC DETAILS Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - DOOR, FIREPLACE & WINDOW PLAN Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - DOOR & WINDOW PLAN Drawing · 8 May 2026 View ↗ PDF BASEMENT G.A Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - EXISTING Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - EXISTING PLAN Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - EXISTING Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - EXISTING Drawing · 8 May 2026 View ↗ PDF GROUND, FIRST & SECOND FLOORS - EXISTING RCP Drawing · 8 May 2026 View ↗ PDF BASEMENT FLOOR FINISHES Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - FLOOR FINISHES Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - FLOOR FINISHES Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - FLOOR FINISHES Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - FLOOR FINISHES Drawing · 8 May 2026 View ↗ PDF BASEMENT - FIRE SAFETY / BUILDING CONTROL Drawing · 8 May 2026 View ↗ PDF FIRST FLOOR - FIRE SAFETY / BUILDING CONTROL Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - FIRE SAFETY / BUILDING CONTRO Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - FIRE SAFETY / BUILDING CONTROL Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - FIRE SAFETY / BUILDING CONTROL Drawing · 8 May 2026 View ↗ PDF BASEMENT - CONCEPT GENERAL ARRANGEMENT Drawing · 8 May 2026 View ↗ PDF BASEMENT - DOOR, FIREPLACES & WINDOW PLAN Drawing · 8 May 2026 View ↗ PDF FIRST FLOOR - DOOR, FIREPLACES & WINDOW PLAN Drawing · 8 May 2026 View ↗ PDF ROUND FLOOR - DOOR, FIREPLACES & WINDOW PLAN Drawing · 8 May 2026 View ↗ PDF BASEMENT, GROUND & FIRST FLOORS - SKIRTING Drawing · 8 May 2026 View ↗ PDF FIRST & HALF, SECOND & THIRD FLOORS - SKIRTING Drawing · 8 May 2026 View ↗ PDF ALL FLOORS - PARTITION TYPES PTD - 1 OF 2 Drawing · 8 May 2026 View ↗ PDF ALL FLOORS - PARTITION TYPES PTD - 2 OF 2 Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - DEMOLITION Drawing · 8 May 2026 View ↗ PDF BASEMENT DEMOLITION PLAN Drawing · 8 May 2026 View ↗ PDF FIRST FLOOR DEMOLITION Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR DEMOLITION PLAN Drawing · 8 May 2026 View ↗ PDF ALL FLOORS - DETAIL 02 Drawing · 8 May 2026 View ↗ PDF EXISTING ELEVATIONS Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - ELEVATIONS Drawing · 8 May 2026 View ↗ PDF STAIRCASE 1 - PROPOSED SECONDARY HANDRAIL Drawing · 8 May 2026 View ↗ PDF PROPOSED - ELEVATIONS Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - PROJECT EXECUTION PLAN Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - PROJECT EXECUTION PLAN Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - PROJECT EXECUTION Drawing · 8 May 2026 View ↗ PDF BASEMENT - PARTITION SETTING OUT Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - PARTITION SETTING OUT Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - PARTITION SETTING OUT Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - PARTITION SETTING OUT Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - PARTITION SETTING OUT Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - PROPOSED RCP Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - PROPOSED RCP Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - PROPOSED RCP Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - PROPOSED RCP Drawing · 8 May 2026 View ↗ PDF BASEMENT - RCP Drawing · 8 May 2026 View ↗ PDF FIRST FLOOR - CONCEPT GENERAL ARRANGEMENT Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - CONCEPT GENERAL ARRANGEMENT Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - CONCEPT GENERAL ARRANGEMENT Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - CONCEPT GENERAL ARRANGEMENT Drawing · 8 May 2026 View ↗ PDF BASEMENT - HVAC Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - POWER & DATA PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR - POWER & DATA PLAN Drawing · 8 May 2026 View ↗ PDF SECOND FLOOR - POWER & DATA PLAN Drawing · 8 May 2026 View ↗ PDF THIRD FLOOR - POWER & DATA PLAN Drawing · 8 May 2026 View ↗ PDF BASEMENT - POWER AND DATA Drawing · 8 May 2026 View ↗ PDF BASEMENT - PROJECT EXECUTION PLAN Drawing · 8 May 2026 View ↗ PDF FIRST & MEZZANINE FLOOR - PROJECT EXECUTION PLAN Drawing · 8 May 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in York - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
York
Application type
Listed Building Consent
Postcode
YO30 7BT
Received
11 May 2026
Validated
11 May 2026
Ward
Guildhall
Parish
Guildhall Planning Panel
Case officer
Show
Target decision
6 Jul 2026
Applicant
Show
Agent
DLP Planning Ltd

Public comments

2comments received
1 neutral1 supporting

Last counted 22 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14918367
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Other decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision performance
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026