Land Parcels South Of 3 And 5 Falcon Hill Falcon Hill Kirkhill Morpeth Northumberland Data via plota.co.uk

26/03896/MISC - Miscellaneous Awaiting decision

Proposal

Installation of 2 x 10m light poles - Reference: OGEAA7539439 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 27 Nov 2026; it is now day 17.

Site constraints 8

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Scheduled monument about 198 m away: Newminster Abbey; National infrastructure project about 1.5 km away: Morpeth Northern Bypass; Local nature reserve about 445 m away: Borough Woods; Coalfield, development low risk area; Inside the Morpeth built-up area; Green belt about 88 m away: Tyne and Wear.
Not affected
Outside flood zones 2 and 3

Checked on 6 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (County) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Miscellaneous
Postcode
NE61 2YG
Received
6 Nov 2026
Validated
6 Nov 2026
Ward
Morpeth Kirkhill
Parish
Morpeth
Case officer
Show
Target decision
4 Dec 2026
Decision level
Officer Opinion
Applicant
Show

Decision outlook

Day 17, past Northumberland (County)'s usual 15 days for utility and infrastructure works. 95% are decided within thirteen weeks, so most likely by 5 Feb 2027.

Day 1739 days to the 56-day target
87%decided within 8 weeks
97%approved
267decided in the last year

Plota live figures for utility and infrastructure works decided by Northumberland (County) in the last twelve months, from validation. Northumberland (County) decision record →

Public comments

No public comments yet.

Last counted 6 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Dec 2026
Env. assessment
No
Northumberland (County)
Planning Authority Score
3.8/10
Below average
#207 of 296 overall
Relevant to this application:
Householder decisions

Northumberland (County) is #167 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (County) decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #158 of 296
91%
Householder approved
Above avg (90%) #178 of 296
62%
Decided in 8 weeks
Below avg (63%) #167 of 296
47%
Extended time limit
Above avg (41%) #210 of 296
80%
Minor dwellings approved
223 decided (1-9 homes)
89%
Major dwellings approved
36 decided (10+ homes)
86%
Change of use approved
71 decided
2,013
Total decisions
233 refused in the year to March 2026