Chilvery Farm , Whiddon Down, Okehampton, Devon, EX20 2QG Data via plota.co.uk

0253/26 - Full Planning Permission - Householder Approved

Proposal

Installation of a domestic oil storage tank Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2026
✓
Validated
11 Aug 2026
✓
Approved
2 Oct 2026

Approved on 2 Oct 2026 · Delegated decision · Last checked 3 Oct 2026

Site constraints 5

Dartmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
1 listed building within 150 m of the postcode pin
Nearest: East Ash Manor Including Garden Wall Adjoining to South East, Grade II, about 32 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartmoor
Application type
Full Planning Permission - Householder
Postcode
EX20 2QG
Received
8 May 2026
Validated
11 Aug 2026
Ward
West Devon
Parish
South Tawton
Case officer
Show
Target decision
6 Oct 2026
Decision
Grant Conditionally
Decision date
2 Oct 2026
Decision level
Delegated decision
Applicant
Show
Agent
O'Brien Van der Steen Workshops Limited

How this decision compares

Decided in 52 days from validation, about the council's usual 55 days. Approved, as 90% of extensions here are.

66%decided within 8 weeks
90%approved
291decided in the last year

Plota live figures for extensions decided by Dartmoor in the last twelve months, from validation. Dartmoor decision record →

Consultation & key dates

Statutory expiry
6 Oct 2026