Part Land At Trimley Marshes Trimley St Martin Suffolk Data via plota.co.uk

DC/26/0590/FUL - Full Application Approved

Proposal

Installation of embedded wall adjacent to the crest of the existing seawall embankment, on the water side, capping beam along the top of the embedded wall together with a handrail, including, erosion protection repairs on the north side of the embankment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Feb 2026
✓
Validated
15 Apr 2026
✓
Approved
3 Nov 2026

Approved on 3 Nov 2026 · Delegated Decision · Last checked 4 Nov 2026

Documents 41

All documents on the council site ↗

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Shotley Gate to Felixstowe Ferry across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Public bridleway 5 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special protection area 16 m away: Stour and Orwell Estuaries
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 15 m away: Orwell Estuary SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Coastal saltmarsh
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 10 m away: Coastal saltmarsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
13 Feb 2026
Validated
15 Apr 2026
Ward
Orwell And Villages
Parish
Trimley St Martin
Target decision
4 Nov 2026
Decision
Application Permitted
Decision date
3 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Haskoning

How this decision compares

Decided in 202 days from validation, 140 days slower than East Suffolk's median of 62 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

45%decided within 8 weeks
98%approved
12%go to committee

Plota live figures for utility and infrastructure works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

No public comments yet.

9 neighbours consulted · Last counted 4 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Jun 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 overall
Relevant to this application:
Householder decisions

East Suffolk is #183 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026