KFC , 2 Park Way , Havant, PO9 1HH Data via plota.co.uk

APP/26/00555 - Consent to display an advertisement Approved

Proposal

Application for Advertisement Consent for: Display of 5no. internally illuminated fascia signs (replacing existing), new illuminated portal to entrance, removal of drive thru height restrictor, and redecoration of exterior. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Jul 2026
✓
Approved
22 Sept 2026

Approved on 22 Sept 2026 · Delegated Decision · Last checked 22 Sept 2026

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
0164B3. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 547 m away: Hampshire Water Transfer and Water Recycling Project
The site is 547 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; Inside the Havant built-up area; Conservation area 98 m away: The Black Dog.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area235 m² (2,530 sq ft)
Energy ratingB (asset rating 27)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in June 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Consent to display an advertisement
Postcode
PO9 1HH
Received
28 Jul 2026
Validated
28 Jul 2026
Ward
St Faiths
Case officer
Show
Target decision
22 Sept 2026
Decision
Approve with Conditions
Decision date
22 Sept 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, 17 days faster than Havant's median of 73 for signs and adverts. Approved, as 93% of signs and adverts here are.

26%decided within 8 weeks
93%approved
27decided in the last year

Plota live figures for signs and adverts decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

1comment received
1 neutral

Last counted 22 Sept 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Other decisions

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.