Motorway Service Area Stafford Services M6 Northbound Stone Staffordshire ST15 0EU Data via plota.co.uk

26/42336/FUL - Full Application Awaiting decision

Proposal

Reconfiguration of northern car park, associated road markings, installation of electric vehicle charging points, canopies, and associated charging infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jun 2026
✓
Validated
24 Sept 2026
Decision
Target date was 19 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 24 Dec 2026, from Stafford's recent utility and infrastructure works.

Comments are open until 16 Dec 2026

Comment on this application ↗

Documents 37

Plans & drawings 19

PDF Moto Stafford North Baseline Habitat Map 2 Plan · 8 Oct 2026 View ↗ PDF Moto Stafford North Baseline Habitat Map 1 Plan · 8 Oct 2026 View ↗ PDF Moto Stafford North Baseline Habitat Map 3 Plan · 8 Oct 2026 View ↗ PDF 260219-PL09A - Proposed Site Plan Sheet 2 of 2 - Stafford Services Proposed Site/Block Plan · 8 Oct 2026 View ↗ PDF 260219-PL08A - Proposed Site Plan Sheet 1 of 2 - Stafford Services Proposed Site/Block Plan · 8 Oct 2026 View ↗ PDF 260219-PL03A - Existing Site Plan Sheet 1 of 2 - Stafford Services Existing Site/Block Plan · 8 Oct 2026 View ↗ PDF 260219-PL04A - Existing Site Plan Sheet 2 of 2 - Stafford Services Existing Site/Block Plan · 8 Oct 2026 View ↗ PDF 260219-PL01E - Location Plan - Stafford Services Location Plan · 8 Oct 2026 View ↗ PDF 260219-PL01E - Location Plan - Stafford Services (1) Location Plan · 8 Oct 2026 View ↗ PDF 260219-PL10 - Proposed Site Elevations - Stafford Services Proposed Elevations · 3 Sept 2026 View ↗ PDF 260219-PL07 - Proposed Block Plan - Stafford Services Proposed Site/Block Plan · 3 Sept 2026 View ↗ PDF 260219-PL09 - Proposed Site Plan Sheet 2 of 2 - Stafford Services Proposed Site/Block Plan · 3 Sept 2026 View ↗ PDF 260219-PL08 - Proposed Site Plan Sheet 1 of 2 - Stafford Services Proposed Site/Block Plan · 3 Sept 2026 View ↗ PDF 260219-PL06 - Demolition Plan - Stafford Services Plan · 3 Sept 2026 View ↗ PDF 260219-PL05 - Existing Site Elevations - Stafford Services Existing Elevations · 3 Sept 2026 View ↗ PDF 260219-PL02 - Existing Block Plan - Stafford Services Existing Site/Block Plan · 3 Sept 2026 View ↗ PDF Existing Site/Block Plan | ApplicationFormRedacted Existing Site/Block Plan · 3 Sept 2026 View ↗ PDF 260219-PL04 - Existing Site Plan Sheet 2 of 2 - Stafford Services Existing Site/Block Plan · 3 Sept 2026 View ↗ PDF 260219-PL03 - Existing Site Plan Sheet 1 of 2 - Stafford Services Existing Site/Block Plan · 3 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 3

Also on the record
National infrastructure project 1.4 km away: Stafford Area Improvements - Norton Bridge Railway; Inside the Cold Norton (Stafford) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area30 m² (323 sq ft)
Energy ratingB (asset rating 29)
UseRestaurants and Cafes/Drinking Establishments/Takeaways
HeatingAir Conditioning

From the energy performance certificate lodged in July 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Stafford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Stafford
Application type
Full Application
Postcode
ST15 0EU
Received
9 Jun 2026
Validated
24 Sept 2026
Ward
Eccleshall
Parish
Chebsey
Case officer
Show
Applicant
Show
Agent
Lanpro

Decision outlook

Day 60 of the 56-day target. Stafford usually decides utility and infrastructure works by day 77.

Day 6024 days to the predicted decision (day 84)
39%decided within 8 weeks
82%approved
8%go to committee

Plota live figures for utility and infrastructure works decided by Stafford in the last twelve months, from validation. Stafford decision record →

Public comments

No public comments yet.

8 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
16 Dec 2026
Env. assessment
No
Stafford
Planning Authority Score
1.8/10
Poor
#278 of 296 overall
Relevant to this application:
Householder decisions

Stafford is one of the slowest councils in England for householder decisions: #290 of 296 on speed. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Stafford decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #227 of 296
90%
Householder approved
Above avg (90%) #195 of 296
26%
Decided in 8 weeks
Below avg (63%) #290 of 296
54%
Extended time limit
Above avg (41%) #245 of 296
72%
Minor dwellings approved
69 decided (1-9 homes)
75%
Major dwellings approved
8 decided (10+ homes)
81%
Change of use approved
26 decided
512
Total decisions
84 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.