2 Dorset Waye,Hounslow,TW5 0ND Data via plota.co.uk

P/2026/2436 - Householder Applications REGISTERED: Under Consultation

Proposal

Retrospective application for the erection of a single storey rear extension and side dormer at 2 & 2A Dorset Waye and a single storey side extension at 2 Dorset Waye. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Validated
16 Sept 2026
Decision
Expected by 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Nov 2026, from Hounslow's recent extensions.

Comments are open until 14 Oct 2026

Comment on this application ↗

Documents 26

Plans & drawings 22

PDF P-All in one Plans Proposed P-All in one Plans Proposed · 23 Sept 2026 View ↗ PDF P-Proposed Elevation P-Proposed Elevation · 23 Sept 2026 View ↗ PDF LocationPlan.pdf P-Location Plan · 17 Sept 2026 View ↗ PDF 01- existing and proposed site plan.pdf P-Proposed Site · 17 Sept 2026 View ↗ PDF 02- existing ground and first floor plan.pdf P-Existing Plans · 17 Sept 2026 View ↗ PDF 03- existing loft floor plan.pdf P-Existing Plans · 17 Sept 2026 View ↗ PDF 05- proposed ground and first floor plan.pdf P-Proposed Plans · 17 Sept 2026 View ↗ PDF 06- proposed loft floor plan.pdf P-Proposed Plans · 17 Sept 2026 View ↗ PDF 04- existing elevations.pdf P-Existing Elevation · 17 Sept 2026 View ↗ PDF 07- proposed elevations.pdf P-Proposed Elevation · 17 Sept 2026 View ↗ PDF Elevation (Rear) - Existing_included_in_Elevation (Front) - Existing.pdf P-Existing Elevation · 17 Sept 2026 View ↗ PDF Elevation (Side) - Existing_included_in_Elevation (Front) - Existing.pdf P-Existing Elevation · 17 Sept 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Elevation (Front) - Proposed.pdf P-Proposed Elevation · 17 Sept 2026 View ↗ PDF Elevation (Side) - Proposed_included_in_Elevation (Front) - Proposed.pdf P-Proposed Elevation · 17 Sept 2026 View ↗ PDF LocationPlan.pdf P-Location Plan · 26 Aug 2026 View ↗ PDF 01- existing and proposed site plan.pdf P-Proposed Site · 26 Aug 2026 View ↗ PDF 02- existing ground and first floor plan.pdf P-Existing Plans · 26 Aug 2026 View ↗ PDF 03- existing loft floor plan.pdf P-Existing Plans · 26 Aug 2026 View ↗ PDF 04- existing elevations.pdf P-Existing Elevation · 26 Aug 2026 View ↗ PDF 05- proposed ground and first floor plan.pdf P-Proposed Plans · 26 Aug 2026 View ↗ PDF 06- proposed loft floor plan.pdf P-Proposed Plans · 26 Aug 2026 View ↗ PDF 07- proposed elevations.pdf P-Proposed Elevation · 26 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 6

Article 4 direction
Dwellinghouses (C3) to small HMOs (C4) - borough-wide Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Hounslow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 726 m away: M4 Junctions 3 to 12 Smart Motorway
The site is 726 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Expansion of Heathrow Airport (Third Runway) (at pre-application, 1390 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hounslow built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 49 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £497,000 in December 2023. Detached house, freehold.

19 December 2023£497,000
3 August 2005£295,000
24 February 1995£112,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area110 m² (1,184 sq ft)
Energy ratingB (84 out of 100), could reach A
PropertySemi-detached house
Built2025
HeatingBoiler and radiators, mains gas
WallsAverage thermal transmittance 0.20 W/m²K

From the energy performance certificate lodged in November 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hounslow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hounslow
Application type
Householder Applications
Postcode
TW5 0ND
Received
26 Aug 2026
Validated
16 Sept 2026
Ward
Heston Central
Case officer
Show
Applicant
Show

Decision outlook

Day 23 of the 56-day target. Hounslow usually decides extensions by day 54.

Day 2333 days to the 56-day target
78%decided within 8 weeks
81%approved
920decided in the last year

Plota live figures for extensions decided by Hounslow in the last twelve months, from validation. Hounslow decision record →

Consultation & key dates

Consultation
23 Sept 2026
Comments by
14 Oct 2026
Statutory expiry
11 Nov 2026
Hounslow
Planning Authority Score
2.1/10
Poor
#268 of 296 councils
Relevant to this application:
Householder decisions

Hounslow is slower than most councils at deciding householder applications, ranking #203 out of 296. 47% of applications have the time limit extended, above the 41% national average. Hounslow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 75% approved vs 90% nationally.

One of the strictest councils
only 75% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hounslow decision statistics
Based on MHCLG data, the year to March 2026
71%
Overall approval rate
Below avg (87%) #294 of 296
75%
Householder approved
Below avg (90%) #293 of 296
56%
Decided in 8 weeks
Below avg (63%) #203 of 296
47%
Extended time limit
Above avg (41%) #208 of 296
38%
Minor dwellings approved
82 decided (1-9 homes)
93%
Major dwellings approved
14 decided (10+ homes)
29%
Change of use approved
72 decided
1,191
Total decisions
340 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.