Recreation Ground Alderman Road Ipswich Suffolk Data via plota.co.uk

26/00519/FUL - Full Application Pending Consideration

Proposal

Installation of 8no. illuminated bollards. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2026
✓
Validated
13 Nov 2026
Decision
Expected by 8 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 2 Jan 2027, from Ipswich's recent signs and adverts.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Direction for Small HMOs. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Local nature reserve about 77 m away: Alderman Canal East
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
National infrastructure project about 1.4 km away: Ipswich Rail Chord; Inside the Ipswich built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ipswich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ipswich
Application type
Full Application
Received
9 Jul 2026
Validated
13 Nov 2026
Ward
GIPPING
Case officer
Show
Target decision
8 Jan 2027
Applicant
Show

Decision outlook

Day 10 of the 56-day target. Ipswich usually decides signs and adverts by day 50.

Day 1046 days to the 56-day target
85%decided within 8 weeks
100%approved
26decided in the last year

Plota live figures for signs and adverts decided by Ipswich in the last twelve months, from validation. Ipswich decision record →

Consultation & key dates

Comments by
7 Dec 2026
Site or press notice
21 Jul 2026
Ipswich
Planning Authority Score
7.6/10
Good
#38 of 296 overall
Relevant to this application:
Householder decisions

Ipswich is faster than most councils at deciding householder applications: #67 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Ipswich decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #40 of 296
98%
Householder approved
Above avg (90%) #18 of 296
76%
Decided in 8 weeks
Above avg (63%) #67 of 296
38%
Extended time limit
Below avg (41%) #129 of 296
81%
Minor dwellings approved
27 decided (1-9 homes)
100%
Major dwellings approved
5 decided (10+ homes)
82%
Change of use approved
62 decided
429
Total decisions
27 refused in the year to March 2026