PEN Y CEFN FARM, Rhydymwyn, Mold, CH7 5HP Data via plota.co.uk

LBC/000595/26 - Listed Building Extensions and Alterations Approved

Proposal

Structural timber renovation and repairs to the ground and first floors. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
9 Jul 2026
Approved
10 Sept 2026

Approved on 10 Sept 2026 · DEL Delegated - Officer · Last checked 10 Sept 2026

Site constraints 11

County Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthAreas of Advertisement ControlNRW SAC Phosphate Consultation River DeeDevelopment Control South TeamAncient woodland
Grade II listed: Pen-y-Cefn
List entry 14817 · 4 m from the pin · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Nutrient neutrality catchment: River Dee
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
Areas of Advertisement ControlCouncil record
Recorded by the council for this site.
Council site ↗
NRW SAC Phosphate Consultation River DeeCouncil record
Recorded by the council for this site.
Council site ↗
Development Control South TeamCouncil record
Recorded by the council for this site.
Council site ↗
Ancient woodlandCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
SSSI 223 m away: Pen-y-Cefn Pasture.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Listed Building Extensions and Alterations
Postcode
CH7 5HP
Received
9 Jul 2026
Validated
9 Jul 2026
Ward
Flintshire Ward Cilcain
Parish
Flintshire Community Cilcain Community Council
Case officer
Show
Target decision
3 Sept 2026
Decision
A01 Approved
Decision date
10 Sept 2026
Decision level
DEL Delegated - Officer
Applicant
Show
Agent
David McChesney Architect Ltd.

How this decision compares

Decided in 63 days from validation, 12 days slower than Flintshire's median of 51 for extensions. Approved, as 93% of extensions here are.

81%decided within 8 weeks
93%approved
174decided in the last year

Plota live figures for extensions decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-15021005
Comments by
21 Aug 2026
Site or press notice
20 Jul 2026