Land to the East of Bank View, Bower Hill Road, Oxspring, Barnsley Data via plota.co.uk

2025/0775 - Full Approved

Proposal

Development of 4 residential dwellings, landscaping and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Aug 2025
✓
Validated
19 Sept 2025
✓
Approved
23 Feb 2026

Approved on 23 Feb 2026 · Delegated · Last checked 16 Oct 2026

Site constraints 6

Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Priority habitat about 7 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barnsley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Barnsley
Application type
Full
Received
29 Aug 2025
Validated
19 Sept 2025
Ward
Penistone East Ward
Parish
Oxspring
Case officer
Show
Target decision
14 Nov 2025
Decision
Approve with Conditions
Decision date
23 Feb 2026
Decision level
Delegated
Applicant
Show
Agent
PB Planning Ltd

How this decision compares

Decided in 157 days from validation, 84 days slower than Barnsley's median of 73 for full applications. Approved, as 90% of full applications here are.

38%decided within 8 weeks
90%approved
227decided in the last year

Plota live figures for full applications decided by Barnsley in the last twelve months, from validation. Barnsley decision record →

Consultation & key dates

Comments by
22 Oct 2025
Env. assessment
No
Barnsley
Planning Authority Score
4.1/10
Below average
#189 of 296 overall
Relevant to this application:
Householder decisions

Barnsley is slower than most councils at deciding householder applications: #252 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barnsley decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #74 of 296
94%
Householder approved
Above avg (90%) #98 of 296
45%
Decided in 8 weeks
Below avg (63%) #252 of 296
44%
Extended time limit
Above avg (41%) #174 of 296
97%
Minor dwellings approved
76 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
80%
Change of use approved
54 decided
673
Total decisions
53 refused in the year to March 2026