Telecommunications Mast - CTIL Multi Storey Car Park Hook Road Epsom Surrey Data via plota.co.uk

26/01333/NOTTE - Telecom Development - Notification Awaiting decision

Proposal

Notification under Regulation 5 of the Electronic Communication Code 2003 (as amended) to utilise permitted development rights for the removal of 3 no. existing wall-mounted support poles. The installation of 3 no. proposed antennas onto the proposed support poles. The removal and replacement of 9 no. RRUS. The relocation of 3 no. existing antennas onto the proposed support poles. The installation of 2 no. 0.3m transmission dishes. The removal and replacement of 1 no. GPS module. The internal upgrade of the existing equipment cabin and ancillary development thereto. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 13 Nov 2026
Decision
Expected by 8 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 19 Dec 2026, from Epsom and Ewell's recent prior approvals.

Site constraints 5

Also on the record
6 listed buildings within 150 m; Radon affected area, class 2; Conservation area 71 m away: Adelphi Road; SSSI 428 m away: Stones Road Pond SSSI; Inside the Epsom built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Epsom and Ewell - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecom Development - Notification
Received
around 13 Nov 2026
Validated
13 Nov 2026
Ward
Town
Applicant
Show
Agent
WHP Telecoms Ltd

Decision outlook

Day 10 of the 56-day target. Epsom and Ewell usually decides prior approvals by day 36.

Day 1046 days to the 56-day target
90%decided within 8 weeks
87%approved
72decided in the last year

Plota live figures for prior approvals decided by Epsom and Ewell in the last twelve months, from validation. Epsom and Ewell decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Epsom and Ewell
Planning Authority Score
7.4/10
Good
#47 of 296 overall
Relevant to this application:
Householder decisions

Epsom and Ewell is one of the fastest councils in England for householder decisions: #16 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Epsom and Ewell decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #236 of 296
89%
Householder approved
Below avg (90%) #203 of 296
90%
Decided in 8 weeks
Above avg (63%) #16 of 296
14%
Extended time limit
Below avg (41%) #10 of 296
66%
Minor dwellings approved
68 decided (1-9 homes)
80%
Major dwellings approved
10 decided (10+ homes)
64%
Change of use approved
11 decided
639
Total decisions
110 refused in the year to March 2026