The Nightingale Estate Downs Road, Hackney, E5 8QH Data via plota.co.uk

2025/2708 - Removal/Variation of Condition(s) Pending

Proposal

Section 73 application to vary condition 2 (approved plans) of planning permission dated 06.02.2018, as amended for ‘ Demolition of existing buildings and structures in and around Olympus Square and the construction of mixed tenure dwellings (use class C3); mixed retail/ cafe floorspace (use class E); community use (use class F2(b)); a management office (use class E); new pedestrian and vehicular access routes; car parking; landscape and public realm improvements; refurbishment works associated with the ground floor entrance lobby and podium of the existing Seaton Point tower and all associated infrastructure.’ The effect of the variation would be to bring Block E into Phase 1 of the development and amend Block E's design, with the main design changes consisting of: alterations to internal arrangements to comply with new building safety requirements; alterations to the external appearance; a change to the use of two ground floor commercial units to two 1-bed flats; alterations to the landscaping and play space; amendments to the road layout; and an energy strategy update. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Dec 2025
✓
Validated
8 Jan 2026
✓
Committee
29 Apr 2026
Decision
Expected by 9 Sept 2026

This application is under consideration - no decision has been issued yet. A decision is expected by 9 Sept 2026.

Planning committee

Decided by Hackney Planning Sub-Committee on 29 Apr 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised approval because the amended scheme was acceptable in planning terms, subject to conditions and a legal agreement.
  • A neutral representation asked whether the proposal would block an important skyline view; no one registered to object.
  • Members voted unanimously to grant permission subject to conditions and a unilateral undertaking.
Read how the committee decided The proposed changes, site and history, officers’ assessment, representations, committee discussion, vote and decision. Includes the meeting recording

Source: Plota analysis of Hackney's committee minutes of 29 Apr 2026.

Documents 95

Statements & assessments 37

PDF TECHNICAL MEMORANDUM (noise) Document · 29 Apr 2026 View ↗ PDF planning/uploads/2696931631776415523:: ::N161 LBA E0 ZZ RP A 200630 Design and Access Statement April 2026 LowRes Part6 Document · 17 Apr 2026 View ↗ PDF planning/uploads/596646951776415443:: ::N161 LBA E0 ZZ RP A 200630 Design and Access Statement April 2026 LowRes Part5 Document · 17 Apr 2026 View ↗ PDF planning/uploads/9955093571776415288:: ::N161 LBA E0 ZZ RP A 200630 Design and Access Statement April 2026 LowRes Part4 Document · 17 Apr 2026 View ↗ PDF Design and Access Statement April 2026 Part3 Document · 17 Apr 2026 View ↗ PDF planning/uploads/4290930111776414952:: ::N161 LBA E0 ZZ RP A 200630 Design and Access Statement April 2026 LowRes Part2 Document · 17 Apr 2026 View ↗ PDF planning/uploads/5998889741776414864:: ::N161 LBA E0 ZZ RP A 200630 Design and Access Statement April 2026 LowRes Part1 Document · 17 Apr 2026 View ↗ PDF Fire Statement Document · 17 Apr 2026 View ↗ PDF Nightingale Estate S73 Planning Statement revised April 2026 Document · 17 Apr 2026 View ↗ PDF Proposed-Drainage-Layout-A1L Drawing · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part9 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part8 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part7 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part6 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part5 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part4 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part3 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part2 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_10-J23299B-Remediation-Method-Statement-Part1 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part6 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part5 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part4 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part3 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part2 Document · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_9-Phase-2-Site-Investigation-Survey-Part1 Document · 10 Dec 2025 View ↗ PDF Air-Quality-Assessment Document · 10 Dec 2025 View ↗ PDF Child-Friendly-Impact-Assessment. Document · 10 Dec 2025 View ↗ PDF Ecological-Impact-Assessment Document · 10 Dec 2025 View ↗ PDF Energy-Strategy Document · 10 Dec 2025 View ↗ PDF Internal-Daylight-and-Sunlight-Assessment Document · 10 Dec 2025 View ↗ PDF Marketing-evidence-Retail-change-of-use-planning-assessment Document · 10 Dec 2025 View ↗ PDF Noise-Impact-Assessment Document · 10 Dec 2025 View ↗
PDF Commenter’s name hidden Show Document · 10 Dec 2025 View ↗
PDF Sustainable-Drainage-Strategy-Technical-Note Document · 10 Dec 2025 View ↗ PDF Transport-Assessment-Addendum Document · 10 Dec 2025 View ↗ PDF Tree-Survey-and-Arboricultural-Impact-Assessment Document · 10 Dec 2025 View ↗ PDF Whole-Life-Cycle-Carbon-Assessment Document · 10 Dec 2025 View ↗

Plans & drawings 44

PDF Public Realm - Drop Kerbs Drawing · 17 Apr 2026 View ↗ PDF Red Line Plan Site Location Plan · 9 Jan 2026 View ↗ PDF Block-E-Proposed-Ground-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Ground-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-First-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-First-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Second-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Second-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Third-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Third-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Fourth-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Fourth-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Roof-Plan Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Roof-Access-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Fifth-Floor-Plan Drawing · 10 Dec 2025 View ↗ PDF Site-Layout-Proposed-Roof-Plan Drawing · 10 Dec 2025 View ↗ PDF Proposed-Site-Sections-CC-and-DD Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Site-Elevations Drawing · 10 Dec 2025 View ↗ PDF Block-E-Proposed-Site-Sections Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-A Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-B Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-C Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-D Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-E Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-F Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-G Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-H Drawing · 10 Dec 2025 View ↗ PDF Unit-Type-I Drawing · 10 Dec 2025 View ↗ PDF Block-E-GIA-Schedule Drawing · 10 Dec 2025 View ↗ PDF Residents-Courtyard-North-Section-A Drawing · 10 Dec 2025 View ↗ PDF Residents-Courtyard-South-Section-B Drawing · 10 Dec 2025 View ↗ PDF Central-Courtyard-Section-C Drawing · 10 Dec 2025 View ↗ PDF Public-Realm-Overview Drawing · 10 Dec 2025 View ↗ PDF Finishes-Plan Drawing · 10 Dec 2025 View ↗ PDF Landscape-Finishes-Plan Drawing · 10 Dec 2025 View ↗ PDF Residents-Courtyard-North Drawing · 10 Dec 2025 View ↗ PDF Residents-Courtyard-South Drawing · 10 Dec 2025 View ↗ PDF Central-Courtyard Drawing · 10 Dec 2025 View ↗ PDF Drawings-Proposed-Phasing-Plan-LBA-13 Drawing · 10 Dec 2025 View ↗ PDF CEMP-Appendix-15_8-Emergency-Response-and-Evacuation-Plan Document · 10 Dec 2025 View ↗ PDF CEMP-Construction-Environmental-Management-Plan-DRAFT Document · 10 Dec 2025 View ↗ PDF Delivery-and-Servicing-Plan Document · 10 Dec 2025 View ↗ PDF Site-Waste-Management-Plan Document · 10 Dec 2025 View ↗ PDF Travel-Plan Document · 10 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 3

Site constraints 6

Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Hackney built-up area; Priority habitat about 16 m away: Deciduous woodland; Designated open space about 16 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Removal/Variation of Condition(s)
Postcode
E5 8QH
Received
10 Dec 2025
Validated
8 Jan 2026
Ward
Hackney Downs Ward
Case officer
Show
Target decision
9 Sept 2026
Decision level
Planning Sub-Committee
Applicant
Show
Agent
Tibbalds Planning and Urban Design

Consultation & key dates

Statutory expiry
9 Sept 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026