Land Adjacent To Unit 2 Port Clarence Road Port Clarence Data via plota.co.uk

26/1189/TNOT - Telecommunication Notification Approved

Proposal

Notice under regulation 5 of electronic communications code regulations for the installation of 1No. 10 metre light wooden pole. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jun 2026
✓
Consultation
17 Jun 2026
✓
Approved
13 Jul 2026

Approved on 13 Jul 2026 · Delegated · Last checked 14 Jul 2026

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area about 261 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
National infrastructure project about 1.3 km away: Lighthouse Green Fuels Project; SSSI about 261 m away: Teesmouth and Cleveland Coast SSSI; Nature recovery project: Tees Estuary Recovering Nature (TERN); 1 listed building within 150 m of the postcode pin; Inside the Billingham built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stockton-on-Tees - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecommunication Notification
Postcode
TS2 1SY
Received
15 Jun 2026
Validated
15 Jun 2026
Ward
Billingham South
Parish
Billingham Town Council
Case officer
Show
Target decision
13 Jul 2026
Decision
Approved with Conditions
Decision date
13 Jul 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 28 days from validation, 10 days faster than Stockton-on-Tees's median of 38 for utility and infrastructure works. Approved, as 99% of utility and infrastructure works here are.

88%decided within 8 weeks
99%approved
93decided in the last year

Plota live figures for utility and infrastructure works decided by Stockton-on-Tees in the last twelve months, from validation. Stockton-on-Tees decision record →

Consultation & key dates

Neighbours
23 Jun 2026
Consultation
17 Jun 2026
Comments by
14 Jul 2026
Statutory expiry
13 Jul 2026
Env. assessment
No
Stockton-on-Tees
Planning Authority Score
5.8/10
Average
#112 of 296 overall
Relevant to this application:
Householder decisions

Stockton-on-Tees is #180 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Stockton-on-Tees decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #67 of 296
97%
Householder approved
Above avg (90%) #44 of 296
61%
Decided in 8 weeks
Below avg (63%) #180 of 296
40%
Extended time limit
Below avg (41%) #155 of 296
79%
Minor dwellings approved
19 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
86%
Change of use approved
44 decided
612
Total decisions
41 refused in the year to March 2026