Arches 245-249 And 824-826 Padfield Road London SE5 9AA Data via plota.co.uk
Proposal
Demolition of the existing arch infills to Arches 245-249 and 824-826 and erection of new arch infills, incorporating alterations to the arrangement of openings; demolition of the warehouse structure fronting Padfield Road and erection of steel palisade fencing with a vehicular gate; demolition of the rear lean-to structures; and installation of an electricity substation within the external yard area (part-retrospective). Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 5 Jan 2027, from Lambeth's recent commercial and major works.
Documents 15
Plans & drawings 12
Application forms 2
Other documents 1
Site constraints 6
Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Lambeth - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
91 Denmark Hill London Southwark SE5 8AA
Tree works 5 day notification: T19 Horse Chestnut tree at the front of No. 91: T...
153 Herne Hill Road London SE24 0AD
Application for a Certificate of Lawful Certificate (Proposed) for the erection ...
Harper House Angell Road London SW9 7LW
Recladding and facade remediation works including replacement of existing roof a...
Leicester House Loughborough Road London SW9 7LN
Recladding and facade remediation works including replacement of existing roof a...
Nevil House Minet Road London Lambeth SW9 7TW
Fire remediation works of the existing external facade including re-cladding of ...
Secker House Minet Road London Lambeth SW9 7TP
Fire remediation works of the existing external facade including re-cladding of ...
Important details
Decision outlook
Day 4 of the 56-day target. Lambeth usually decides commercial and major works by day 57.
Plota live figures for commercial and major works decided by Lambeth in the last twelve months, from validation. Lambeth decision record →
Public comments
No public comments yet.
Last counted 4 Nov 2026
Consultation & key dates
- Statutory expiry
- 28 Dec 2026
- Env. assessment
- No
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Lambeth ranks #164 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.
Track this application
Arches 245-249 And 824-826 Padfield Road London SE5 9AA
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.